2727 SW Snyder Blvd, Ankeny, IA 50023

1 (888) 964-2020



Navigation

Brownfield Site Development: Waunakee Public Library

InBusiness Magazine 2020 Project of the Year, Best New Development or Renovation — Education I AIA Wisconsin 2022 Merit Award for being a “Catalyst project for village economy and life”

Brownfield Site Develops into a New Library

The Village of Waunakee had been planning for a new library since 2007, making the completion of its award-winning facility in 2019 a significant milestone. After a multi-year site search, the Village selected the former Waunakee Alloy Corporation property – a brownfield site – for redevelopment. The project transformed a community eyesore into a vibrant public facility, strategically located just north of the community’s growing downtown. A brownfield site is an abandoned or underutilized industrial or commercial property that may contain environmental contamination, often deterring redevelopment. To address these challenges, the United States Environmental Protection Agency (EPA) provides grants and technical assistance to encourage communities, states, and developers to put these blighted properties back into productive use. The Brownfields Program provides support to safely clean up and sustainably reuse contaminated properties under the EPA’s Land Revitalization Program.

The new Waunakee Public Library is a 40,000-square-foot facility designed by OPN, with Snyder & Associates providing site development, utility design, stormwater management, multi-use trail design and planning, pedestrian bridge design, and project permitting services. The project successfully addressed significant challenges, including soil contamination, high groundwater, coordination with multiple regulatory agencies, and the presence of a mapped environmental corridor. Beyond the library itself, the project prioritized active transportation and improved pedestrian and bicycle connectivity by incorporating a multi-use trail and pedestrian bridge over Six Mile Creek into the site design. The 12-foot-wide, 900-foot-long paved trail connects Pleasant Drive to Madison Street on the south side of the new library on the north side of the creek, and doubles as a fire lane. The pedestrian bridge further enhances access by allowing patrons to cross Six Mile Creek and reach additional parking located on the south side of the site.

Key Achievements

  • Navigated multiple reviewing agencies and permits with long lead times. Finished the design on time with the layout the client desired.
  • Designed the site and trail with less than 10,000 square feet of wetland fill, enabling the project to achieve a general wetland fill permit that was less costly and timely for the Wisconsin Department of Natural Resources (WDNR) permitting process.
  • Site and trail design incorporated the necessary cap required by the WDNR for leaving contaminated soils on-site, which avoided exuberate fees for removing contaminated soil.
  • Designed the site and trail outside of the floodplain line to avoid lengthy FEMA approvals.
  • Incorporated the site and trail design with a 90-foot span pedestrian bridge across Six Mile Creek for access to parking on the south side without affecting the 100-year floodplain.
  • Site design allows for a future building expansion to the west.

 

Client

Village of Waunakee

Client Type

Project Type

Scott Anderson, P.E.

Scott Anderson, P.E.

Civil Engineer

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country