Growth in Pleasant Hill Leads to Sanitary Sewer System Review

Rapid Community Expansion Stresses Existing Infrastructure

Community growth is a good thing, especially in suburban areas. However, successful and sustainable growth doesn’t happen on its own — it requires meticulous planning and strategic thinking. In 2010, the City of Pleasant Hill was in the midst of a rapid population expansion, experiencing a twelve percent increase in just nine years. If not adequately addressed, growth on this scale can put a strain on existing infrastructure, economic practices, and environmental processes.

As the city engineers for Pleasant Hill, the municipality tasked Snyder & Associates with conducting a Sanitary Sewer System Review and engineering report. The city-wide examination aimed to identify long-term system and infrastructure upgrades required to support the community’s continued growth. After experiencing excessive stormwater flows and wastewater leeching into a nearby creek, the city requested the study also include a partial infiltration & inflow (I/I) assessment.

Creating a Viable & Adaptable Infrastructure Plan

In an effort to guarantee the usefulness of the information gathered by the sewer study even further, our team intentionally structured the plan to avoid forecasting future development. Instead, all improvements outlined in the plan were presented so they corresponded to acres of development instead of a specific timeline. Therefore, if development moves faster than expected (or gets put on hold) the infrastructure plan remains viable. This strategy ensures the community can expand at its own pace and maintain growth long into the future without fear of overtaxing their system.

Diverse Planning Tool Capable of Serving Multiple Communities

This planning document’s value was proven when Pleasant Hill’s neighboring community, Altoona, sought collaboration to address a portion of their sanitary sewer. Altoona’s service area covers a section that naturally drains towards Pleasant Hill. Serving this area with sanitary sewer would have required multiple pump stations to convey the flows back to Altoona’s wastewater facility. Through our planning efforts, an alternative means of service was identified in the form of a gravity sewer conveyance to Pleasant Hill’s wastewater collection system.

Utilizing the Sanitary Sewer System Review and the foundation it provided, our team analyzed and evaluated the impacts this alternative posed on the Pleasant Hill system and the capacity enhancements that would be necessary to accommodate Altoona’s wastewater dilemma. Our evaluation highlighted improvements the added load would require and aided in compensation negotiations between the two municipalities.

Targeting Specific Areas for Sanitary Sewer Improvements

One of this project’s primary focus areas consisted of the East Side Sanitary Sewer Main Extension which serves a large portion of the Spring Creek watershed. In this area, the city saw the potential to serve up to an additional 16 square miles in the future, nearly three times the city’s current size.

While this expansion potential was impressive, it also brought the uncertainty of potentially overloading portions of the city’s wastewater collection system. The at-risk areas our team focused on included the Northeast 80th Street lift station, the Southeast 6th Avenue lift station, as well as several, aged sewer systems located downstream from sewer extensions and their expanded service areas. To find deficiencies that may hinder the current system from withstanding the anticipated increase in demand, our team used the city’s GIS database to calculate sewer capacities. They were then able to estimate sewer flows based on overall land use.

Numerous Improvement Options Provided to Meet Demand

manhole with corroded seals found during sanitary sewer system review

Manholes such as this one with extensive corrosion cause leakage into sewer systems.

To avoid future infrastructure issues, our team put forward multiple modifications and upgrades for consideration. Some of these adjustments included:

  • Upgrading current 4″ force main pipes to 12″ and 16″ force mains at each lift station
  • Incorporating new wetwell/drywells and vertical screening system at each lift station
  • Reconstructing several critical sewer sections with larger pipes to increase capacity
  • Rehabilitating defective manholes and covers

Client

City of Pleasant Hill

Client Type

Project Type

Eric Cannon, P.E.

Eric Cannon, P.E.

Development Business Unit Leader

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country