Design & Construction of New Electrodialysis Reversal (EDR) Water Treatment Plant: Walnut, Iowa

This project involved the construction of a new facility to treat drinking water from deep Jordan Sandstone wells containing excessive amounts of naturally occurring fluoride and radium. Water sourced from the Jordan aquifer in southwest Iowa is also typically high in hardness and iron. The city-owned the two existing Jordan wells, which were historically excellent water producers and very reliable due to depth. As raw water resources in the area are scarce, it was the desire of the owner to maintain both existing wells and reduce radium, fluoride, and hardness to acceptable levels.

The new treatment process consisted of high technology equipment to provide appropriate treatment for the raw water. As the well water contained a significant concentration of iron and manganese, a LayneOx pressure filter system was utilized, allowing for a significant reduction in equipment footprint. Following the iron filter, an Electrodialysis Reversal (EDR) membrane system was installed. EDR provided a high technology solution to reduce fluoride and radium in the source water to meet drinking water standards. In addition, hardness can be reduced to a level the plant operator selects. The Electrodialysis Reversal is adjustable in that changes to the electrical supply can vary final water quality produced by the process.

The facility also included a new steel ground storage reservoir and high service pumping to deliver finished water to the distribution system. New chemical feed and storage systems were constructed and housed in new rooms in the plant. An attractive metal building was provided for the entire facility, which includes office space, an electrical room, restroom, full laboratory, and storage space.

The finished water is treated with liquid sodium hypochlorite solution to ensure disinfection. Finished water pH is continuously monitored and adjusted to provide stable water. In addition, polyphosphate is added to the finished water to help protect the distribution system. The process is controlled by a complete SCADA electronic control system with online analyzers for many water parameters. Plant capacity is approximately 200 gpm (0.228 MGD).

Client

City of Walnut

Client Type

Project Type

Darin Jacobs, P.E.

Darin Jacobs, P.E.

Water Resources Work Group Leader

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...