2727 SW Snyder Blvd, Ankeny, IA 50023

1 (888) 964-2020



Navigation

Back to Projects | Project Categories: Development

Bold Renovations Prepare Hilldale Shopping Center for Shifting Consumer Preferences

Originally opened in 1962, Hilldale Shopping Center has served as a central retail destination for shoppers in Madison and the surrounding area. Numerous site expansions and renovations have taken place over the decades, as well as a few changes in ownership. The present owners, Massachusetts-based WS Development, have implemented some of the boldest renovation efforts to date. As consumer shopping preferences have changed, converting the fully-enclosed mall to an open-air format was viewed by the owner as the right strategy to attract more shoppers and enhance the retail experience.

After a similar, successful project on the mall’s north end, WS Development hired Snyder & Associates to reconfigure 55,000 square feet of retail space on the shopping center’s south end to build an outdoor courtyard, create store entrances that open to the street, and provide more visibility for the businesses in the shopping center. This plan would effectively remove the roof over the central concourse and create a common green space with curbside parking.

lady walking dog through mall open space

Patrons are able to participate in “mall walking” while still enjoying the outdoors.

Although the project took away about 10,000 square feet of retail space from the mall, it created a new entrance for the AMC movie theater, relocated the University Book Store, and added a location for a new Apple Store. Part of the design effort also included upgrading the grease interceptors to accommodate a future restaurant site.

Utility Identification, Minimizing Shopper Disruptions, and Limiting Permitting Created Challenges

Our team had to navigate a few site-specific challenges throughout the design process. First, years of upgrades and additions around the mall made utility identification a tricky ordeal. Our team worked diligently to make sure all private utilities were mapped before work began. Second, to minimize disruptions to shoppers, maintaining store access was a critical component of the plan. The Snyder & Associates engineers ensured that a safe environment was continuously the top priority during construction. Finally, to minimize project time and expense, the owners requested the design team limit permitting at the city level where possible.

The work at the newly renovated Hilldale Shopping Center is now complete and stores are bustling with shoppers. The fresh outdoor spaces have created a family-friendly environment where shoppers can gather to recharge. Our team’s diligent approach and careful planning kept the project on schedule and stores fully operational throughout the construction process.

Client

WS Development

Client Type

Project Type

Scott Anderson, P.E.

Scott Anderson, P.E.

Civil Engineer

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country