2727 SW Snyder Blvd, Ankeny, IA 50023

1 (888) 964-2020



Navigation

New High School Building & Stadium Complex Design for Johnston Community

Community Growth Requires New Stadium Complex Design 

Johnston, Iowa is a rapidly growing community located just north of Des Moines. Between 2000 and 2013, the city’s school district grew by over 2,400 students, prompting the need for a new high school and stadium complex. Both the high school and athletic complex are among largest facilities of their kind in the state of Iowa. The new high school is a two-story building with three wings and 369,000-square-feet of space to accommodate up to 1,800 10th, 11th, and 12th-grade students. Noteworthy features include retractable walls, improved access to lockers, common areas, and exits, along with a 1,200-seat auditorium and an 8,000 square foot fitness center, which can accommodate up to 96 students. Dragon Stadium, the sports complex adjacent to the school, features a synthetic athletic field, all-weather track, and tennis courts. There is also discus, shot put, and long jump fields. The stadium has a FieldTurf playing surface that's ideal for use by both football and soccer teams as well as bands. With 5,300 seats, the athletic complex has plenty of seating space, a key improvement over the previous stadium. Larger restrooms, concession stands, and locker rooms are additional improvements that will serve the high school well.

Creating Safe & Efficient Traffic Circulation

Serving as the civil engineer and landscape architect for the project, Snyder & Associates provided expertise in pavement design, stormwater management, utility design, and landscape design. Collaborating with Johnston community schools, we worked to guide safe vehicle and pedestrian circulation. Traffic consideration included normal school days and large athletic events. Two roundabouts near the primary entrance to the school were public street improvements that we coordinated with the City of Johnston. Three primary access drives service the site. Designated areas include:
  • Staff parking and bus drop-off on the north end of the building
  • Visitor parking and parent drop-off at the east main entrance
  • Student and event parking on the south end of the site
  • Service vehicles along the west side of the building
Project construction began in May 2014 and concluded in April 2017, just in time for the start of the 2017-2018 school season. Collaboration between Snyder & Associates, Stahl Construction, FRK Architects & Engineers, and the Johnston community and school district were essential to project success.

Client

FRK Architects & Engineers

Client Type

Project Type

Clay Schneckloth, PLA

Clay Schneckloth, PLA

Landscape Architect

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country