Roadway Upgrades Lead Community to Implement Streetscape Upgrades: Pleasant Hill

With a population that has nearly doubled over the past two decades, more than 10,000 people now call the City of Pleasant Hill home. Situated on the eastern outskirts of Des Moines, Pleasant Hill is also a major hub of the Gay Lea Wilson Trail, providing direct access to Des Moines and Altoona for outdoor enthusiasts. In light of the city’s steady growth, new streets and infrastructure were necessary to accommodate the burgeoning community. At the same time, a desire existed among city leaders to create a cohesive sense of place by tying certain areas of the community together through the use of streetscape and gateway enhancements.

One notable corridor was the newly reconstructed section of Northeast 70th Street extending south from Highway 163 (East University Avenue). This section of roadway was emerging as a major thoroughfare for Pleasant Hill residents seeking quick access to the U.S. Route 65 interchange. Snyder & Associates was tasked with not only redesigning the roadway to accommodate heavier traffic loads but also to “rebrand” the roadway section as a distinctive Pleasant Hill entry point.

Insufficient Capacity & Dangerous Intersection Addressed by Roadway Design

In its pre-construction state, NE 70th Street was too narrow to effectively handle the increased traffic flows. Also, a lack of sidewalks, ADA-compliant ramps, and other multi-modal considerations were all negative marks for attracting new residents to the area. NE 70th Street linked up with Rising Sun Drive a short ⅓-mile south of Highway 163. The current configuration had Rising Sun Drive intersecting NE 70th Street on a curve. This caused reduced sightlines for vehicles attempting to enter NE 70th and created a dangerous situation.

Managing Streetscape Requirements with Manageable Maintenance 

The Snyder & Associates team coordinated with city staff and the public to help guide the design process and address key challenges. After a topographic survey and site analysis were complete, the designers prepared a master plan that incorporated attractive and safe streetscape features that help to create the desired sense of place. With the main goals of welcoming people to Pleasant Hill, expanding the roads, and tying together the existing gateway, the design team considered crucial elements, like stormwater, utilities, and safety, along with a balanced aesthetic and easy-to-maintain amenities.

The team’s forward-thinking approach included features like wider sidewalks to accommodate future growth, decorative pavements in the raised medians, new signage, landscaping, and upgraded street lighting. A gateway sign at the entrance of the roadway welcomes visitors and decorative, wave-like concrete and steel median dividers create a distinct transition into the neighborhood. A new roundabout eliminated the dangerous intersection and created an unimpeded traffic flow at the intersection of Northeast 70th Street and Rising Sun Drive.

A concept rendering of a roundabout.

A roundabout at NE 70th Street and Rising Sun Drive keeps traffic moving smoothly along the corridor.

Once fundraising is complete, a one-of-a-kind art piece will be installed in the center of the roundabout. The freestanding sculpture “Phoenix” by Volkan Alkanoglu will stand 26 feet high and be visible from Highway 163. Future development plans call for roadway construction to continue further south and create a new boulevard section that connects near Four Mile Elementary School, incorporating some of the same decorative features.

These thoughtfully planned improvements create a pedestrian-friendly environment with better traffic control and a noticeable transition to the neighborhood. When the final landscaping pieces are in place in spring 2020, guests will be able to fully appreciate the visual appeal of the amenities incorporated into this growing community.

Client

City of Pleasant Hill

Client Type

Project Type

Mark Perington, P.E., PTOE

Mark Perington, P.E., PTOE

Traffic Work Group Leader

recent projects & completed jobs

Related Projects

Transportation

Knoxville Pavement Management Study Update Guides Long-Term Street Investment

Snyder & Associates, Inc. completed a 2025 update to the City of Knoxville’s 2015 Pavement Management Study, helping City leaders evaluate current street conditions, measure the effectiveness of past pavement investments, and plan future improvements through a data-driven process. The […]

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Transportation

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a pavement improvement effort. It also created the right moment to rethink how the corridor functioned for […]

Public Spaces

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming destination for community gatherings, family events, and outdoor entertainment. Snyder & Associates assisted with […]

more than 45 years

Serving Clients Around the Country