2727 SW Snyder Blvd, Ankeny, IA 50023

1 (888) 964-2020



Navigation

Back to Projects | Project Categories: Parks | Trails | Water Resources

Water Needs Drive the Creation & Evolution of Ada Hayden Heritage Park

Protecting an Emergency Water Source

The City of Ames has used groundwater as its primary drinking water source for many decades.

aerial view of ada hayden park in ames iowa

This aerial view provides a birds-eye vantage of the Ada Hayden Park.

During unseasonably dry years, the hydraulic connection between this groundwater source and other area waterways has occasionally resulted in a reduction to their water supply. Starting in the late 1970s, the city started pumping water from Hallett’s Quarry, situated north of town, into the Skunk River basin to help replenish the drinking water aquifer during these dry spells. While the city has mainly used this option only during times of exceptional drought to recharge the groundwater supply, it’s remained a viable solution as a secondary drinking water source. When Hallett’s Quarry ceased operations in the 1990s, city leaders were concerned about the potential impact of proposed residential and commercial expansion on both the in-lake water quality, as well as the city’s continued access to the water for streamflow augmentation. Presented with a unique opportunity, the City of Ames held a successful bond referendum to acquire 437 acres of land surrounding and including the abandoned sand and gravel quarry to expand their recreational offerings and protect their secondary water supply source.

Improving Water Quality through Sustainable Wetlands

At the time of the city’s acquisition, the newly renamed Ada Hayden Heritage Park wasn’t much of a park. Remnants of the quarry included two lakes with an approximate surface area of

winding ada hayden trail alongside an established prairie area

Native vegetation was re-established in the prairie areas.

125-acres but nothing else in the way of native vegetation or active wildlife. The professionals with Snyder & Associates were enlisted to provide design and construction documents for more than 350 acres of the site, including utilities, parking lots, trails, restroom building, pedestrian bridge, shoreline improvements, and prairie restoration. While the recreational amenities were important, the primary project goal remained the preservation of both bodies of water and improving their water quality. To that end, these multi-year improvements began with the construction of three bioengineered wetland treatment cells in the west and southwest portions of the site for the purpose of intercepting and filtering stormwater runoff from existing and future residential development in the area. The addition of the wetlands has reduced the average concentration of turbidity and total suspended solids (TSS) reaching the lake, as well. Another major accomplishment was the stabilization of approximately three miles of shoreline. The use of heavy stones and rip-rap reduces the possibility of wind-blown erosion and creates better shoreline access. Additionally, when the city acquired the property, the quarry consisted of two large lakes separated by a central causeway. For better recreational access, the causeway was opened to allow the movement of boats between the two lakes.

a secondary gravel ada hayden trail leading to wetlands and prairie areas

The wetlands and prairie are easily accessible through the secondary trail network.

User Access & Recreational Opportunities

To accommodate many of the recreational features and attract native wildlife, our team also developed a plan to restore much of the existing parkland to open prairie. Now, it’s not uncommon for rare bird species such as loons, sandhill cranes, and bald eagles to be spotted in the park. The entire park is fully accessible by approximately three miles of hard surface trail and two miles of secondary gravel trail. The secondary gravel trail allows visitors access to the native prairie and wetland features within the park. Site visitors will also appreciate other conveniences such as restroom facilities, a picnic shelter, a boat launch, ample parking for cars and boat trailers, an ADA-compliant fishing dock, and a pedestrian bridge spanning the opening in the causeway. Our team worked in close coordination with the Iowa Department of Transportation (DOT), the United States Army Corps of Engineers (USACE), Iowa Department of Natural Resources (DNR), and the Story County Conservation Board during park planning, design, and the multiple permitting phases of the project.

landscape view of the ada hayden pedestrian bridge from across the lake

The pedestrian bridge along the causeway adds a new dimension to the park’s trail network.

Client

City of Ames Parks & Recreation Department

Client Type

Project Type

Clay Schneckloth, PLA

Clay Schneckloth, PLA

Landscape Architect

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country