WRA Fourmile Interceptor

The Fourmile Sewer Interceptor project extended from the Wastewater Treatment Facility to the constructed Fourmile Interceptor Extension project at Broadway Avenue. This was an expansion project to serve the communities of Ankeny, Altoona, Bondurant, Des Moines, and Polk County. Design capacities for the projects are from approximately 50 MGD to approximately 80 MGD. Allowable infiltration of new sewers was reduced to 100 gal/in dia./mile/day for this project, and final testing results averaged around 25 gal/in dia./mile/day.

This expansion project address’ the wastewater treatment needs of Ankeny, Altoona, Bondurant, Des Moines, and Polk County.

The project was separated into five segments with four construction contracts. The project included construction of approximately 16,700-feet of 72-inch and 20,100-feet of 60-inch sanitary sewer through a mix of industrial, commercial, residential, and agricultural areas within the City of Des Moines and Polk County at depths up to 25-feet including open cut and trenchless installation methods. The new sewer primarily paralleled an older sewer/s and an additional project was performed to investigate and evaluate the condition of existing sewers and manholes. This project also included two active railroad crossings requiring significant coordination with the railroad.

With the exception of geotechnical engineering, Snyder & Associates completed all aspects of the project including comprehensive facility planning, wetland delineation, right-of-way acquisition and negotiations, construction documents, construction observation, construction staking, and construction administration.

Client

WRA Wastewater

Client Type

Project Type

Wes Farrand, P.E.

Wes Farrand, P.E.

Civil Engineer

recent projects & completed jobs

Related Projects

Water

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower with a new 1.0-million-gallon elevated storage tank, increasing capacity fivefold over the existing 200,000-gallon tower built in […]

Water

Radial Collector Wells Strengthen Water Supply for Atchison, Kansas

Snyder & Associates helped Atchison develop new radial collector wells, improving raw water capacity, reliability, and long-term drinking water resilience.

Aerial rendering of the Grand Avenue roadway extension in West Des Moines|Map of National Flood Hazard Layer of the project area|Image of construction taking place for Grand Avenue extension in West Des Moines Iowa with construction workers and cement trucks in the background|Newly poured roadway with road crew working in the background.|Image of construction taking place for grand avenue extension in West Des Moines Iowa|New bridge over Johnson Creek with earthwork still to complete underneath.|View of the Johnson Creek Bridge along Grand Avenue with the new monuments installed on either side.|Custom-designed monuments for the City of West Des Moines

Structural, Transportation, Water

Grand Avenue Extension in West Des Moines Opens Additional Area for Development

To provide access to Microsoft's new data center and open additional area for development in southwest West Des Moines, city leaders contracted with Snyder and Associates and our structural engineering subsidiary, Shuck-Britson, to design the roadway extension of Grand Avenue, […]

more than 45 years

Serving Clients Around the Country