Interstate 80 Shoulder Repairs Make Room for Future Expansion

Snyder & Associates was tasked with planning and designing roadway shoulder repair work along an extensive stretch of Interstate 80 for the Iowa Department of Transportation (DOT). Spanning four counties (Jasper, Polk, Dallas, and Poweshiek) and over 117 total miles, the expansive project consisted of reconstructing mainline existing shoulders (inside and outside) and performing guardrail updates. Additionally, culvert extensions and various other drainage improvements were included in the project.

Unique Challenges Lead to “Virtual” Solutions

Several considerations had to be taken into account at the outset of this project. Foremost was the significant amount of traffic along the corridor which made performing a traditional field exam potentially dangerous. As many as 31,000 vehicles per day travel the project corridor and a significant portion of this traffic consists of large vehicles and semi-truck traffic.

To make this portion of the project as safe as possible, the innovative team members at Snyder & Associates conducted a preliminary “virtual field exam.” Prior to the field exam meeting, Snyder & Associates personnel visited the project corridor, taking detailed notes and photos of each area of concern. This information was then loaded into presentation software. This made it easy to hold the field exam meeting with all of the necessary stakeholders without the need for a large group visiting the actual site.

Poor Drainage & Expansion Considerations

cracked rumble strip along roadway

Long stretches of the cracked and deteriorated shoulder had become a safety issue.

Another consideration in the project corridor was the condition of the existing shoulder pavement. In many sections, it had deteriorated to a point where pavement replacement was the only solution. The shoulder pavement exhibited signs of frost heave during cold weather months and in several cases, it was severe enough to block drainage and allowed ice to build up at the edge of travel lanes during melt and re-freeze events. The shoulder replacement process in these areas also included the construction of a drainable base and installation of subdrain to correct this issue.

On the Polk County stretch of the project, future interstate expansion plans from four lanes to six lanes also needed to be taken into consideration. To account for this upgrade, the shoulders constructed between mileposts 144 and 152.5 were constructed to full-depth and full-width specifications to serve as the future lanes when the expansion occurs.

This substantial reconstruction project will provide a safe roadway network for years to come. Snyder & Associates is proud that the Iowa DOT continues to seek out our professional engineering and design services for their most complex projects.

Client

Iowa DOT

Client Type

Project Type

Rich Voelker, P.E.

Rich Voelker, P.E.

Transportation Business Unit Leader

Related Projects

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

The 8th Avenue Reconstruction & Mount Vernon Road Rehabilitation project, designed by Snyder & Associates, represents one of Cedar Rapids’ most significant...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...
Overlaid pavement on 1st Ave with railroad crossing in the background|Aerial view of Ellis Boulevard and 6th street NW Connector & 1st ave rehabilitation in Cedar Rapids Iowa|Aerial view of Ellis Boulevard and 6th street NW Connector & 1st ave rehabilitation in Cedar Rapids Iowa|Aerial view of Ellis Boulevard and 6th street NW Connector & 1st ave rehabilitation in Cedar Rapids Iowa|Railroad crossing|Roundabouts Streamline Traffic Flow|Cars driving around the roundabout creating efficient traffic flow|1st Ave & 6th Street Intersection facing North Before & After Construction

Ellis Boulevard & 6th Street NW Connector & 1st Avenue Rehabilitation: Cedar Rapids

2025 Engineering Excellence Award in the Transportation Category awarded by The American Council of Engineering Companies (ACEC) A planning initiative performed in the...
Aerial rendering of the Grand Avenue roadway extension in West Des Moines|Map of National Flood Hazard Layer of the project area|Image of construction taking place for Grand Avenue extension in West Des Moines Iowa with construction workers and cement trucks in the background|Newly poured roadway with road crew working in the background.|Image of construction taking place for grand avenue extension in West Des Moines Iowa|New bridge over Johnson Creek with earthwork still to complete underneath.|View of the Johnson Creek Bridge along Grand Avenue with the new monuments installed on either side.|Custom-designed monuments for the City of West Des Moines

Grand Avenue Extension in West Des Moines Opens Additional Area for Development

To provide access to Microsoft's new data center and open additional area for development in southwest West Des Moines, city leaders contracted with Snyder and...
Roundabout in Anamosa Iowa|Roundabout in Anamosa Iowa|Overview of US 151 Grade Separation and Roundabout in Anamosa Iowa|Roundabout design showcasing lighting and signage in Anamosa Iowa|Man cutting the ribbon for US 151 Grade Separation and Roundabout in Anamosa Iowa||US 151 Grade Separation and Roundabout: Anamosa

US 151 Grade Separation and Roundabout: Anamosa, Iowa

In a strategic move to address safety concerns and bolster regional connectivity, the City of Anamosa required a unique transportation solution to address a regional...
NE 51st Avenue intersection along US 69 reconstruction project.|intersection with traffic lights|Intersection at NE 70th Avenue intersection along the US 69 reconstruction project.|Intersection of NE 60th Avenue near the Polk County Sheriff's Office along US 69 reconstruction.|median under construction|LiDar image of US 69 reconstruction|Snyder & Associates Transportation experts

US 69 Reconstruction: Paving the Way for Future Growth in Ankeny

2024 Engineering Excellence Awards, Honor Award Winner in the Transportation Category awarded by the American Council of Engineering Companies (ACEC) of Iowa In the...
newly constructed roadway intersection|Road traffic transitions into roundabout|Improved traffic flow due to new corridor|Snyder & Associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

Tower Terrace Road Upgrades Fill Gap in Northern Connector Initiative

Nearly two decades ago, planners for Linn County and several surrounding communities — including Cedar Rapids, Hiawatha, and Marion — began laying the groundwork for an...
|||Aerial rendering of Hickman and Interstate 35/80 diverging diamond interchange.||Street level rendering of Hickman and Interstate 35/80 diverging diamond interchange.|||Rendering of pedestrian tunnel underneath Interstate 35/80 at Hickman Road diverging diamond interchange.|Bridge abutments design treatment underneath Interstate 35/80 diverging diamond interchange bridge.|||Median treatment rendering underneath Interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

Progress on the Interstate 35/80 & U.S. 6 Diverging Diamond Interchange Upgrade

The exponential growth of communities, particularly in the western suburbs of Des Moines, has been nothing short of remarkable. The population of Waukee, for example,...
||||

Cedar Heights Drive Reconstruction Continues Cedar Falls Corridor Upgrades

For several years, the Cedar Falls community has been expanding its transportation network along the southern edge of town, including the Greenhill Road corridor. This...

more than 45 years

Serving Clients Around the Country

DB+