Ioway Creek Streambank Stabilization & Low-Head Dam Mitigation

Severe Streambank Erosion Requires Mitigation Efforts

Meandering through Central Iowa, Ioway Creek, formally known as Squaw Creek, is a 42-mile-long tributary that empties into the South Skunk River on the southeast side of Ames. Due to the waterway’s steep banks, highly erodible soils, and volatile flooding events, significant streambank erosion had occurred over many years. The erosion had progressed to the point that it threatened the stability of a 24-inch water main running under the creek near the Lincoln Way Bridge. This pipeline transports potable water to serve approximately 18,000 residents in the area along with the entire region containing Iowa State University. Previous attempts to control the erosion issue in this highly flood-prone region were unsuccessful, prompting the Ames city leaders to seek a sustainable, long-term solution. Snyder & Associates was contracted to recommend engineering techniques that could stabilize the creek banks, in turn protecting the existing water main.

Adjustments Made in Planning Phase Produce Added Safety Features

restored streambank with rip rap rock

Restored Ioway Creek stream during low-flow conditions

Throughout the analysis and planning phase, the project evolved into a more extensive undertaking, addressing safety concerns regarding a low-head dam located in the area. The dam created circular currents that compounded the streambank erosion, impeded fish passage, and posed a drowning hazard. This adjustment was proved necessary as two kayakers narrowly survived a life-threatening situation after being sucked into the dam’s undertow. Occurring just before the project’s completion, this timely incident drew further attention to the safety hazards posed by low-head dams. Working with the Federal Emergency Management Agency (FEMA) for over six years, Hazard Mitigation Grant Program (HMGP) funding was secured to finance the streambank stabilization project and mitigate the threat posed by the dam. The many streambank stabilization efforts our team incorporated involved:
  • Flattening both the east and west bank of the creek
  • Incorporating a low-flow bench to reduce flow velocities and bank pressure
  • Protecting lower banks with a stone revetment
  • Reinforcing upper banks with erosion control mat, native vegetation, and live stakes

Rock Arch Rapids: An Alternative to Complete Dam Removal

While city leaders desired the complete removal of the low-head dam, a scour analysis performed by the Snyder & Associates team indicated the dam protects the piers of the Lincoln Way Bridge and another water main immediately upstream. To meet the client’s request for complete dam removal while also producing a stable mitigation option, our experts were challenged with creating an innovative alternative.
rock weir under flowing water

Rock weir provides a gradual drop for improved fish passage and recreational safety.

Our team determined the construction of rock arch rapids would be perfectly suited for this location. Rock arch rapids are a series of steps that gradually transition water flowing downstream from the dam to meet channel elevation. The stream section where a wall-like concrete dam once stood, now features a gradual stretch of rock barriers. This solution slowed the flow of the stream, reduced erosion on the banks, and eliminated the roller (or boil) below the dam. By implementing this tiered structure, our team was able to improve safety for recreational stream users and create a series of pools that allow fish to migrate upstream. Once completed, this project successfully protected city infrastructure, improved stream functions, and stabilized the streambank. Also, the outcome helped improve recreational safety, restore stream connectivity, and enhance the aquatic and riparian habitat in the area. Partnerships between the City of Ames, state and federal regulatory agencies, and other interested stakeholders helped drive the success, leading to the project being highlighted during the 11th Annual Iowa Water Conference.

Client

City of Ames

Client Type

Project Type

Mark Land, P.E., CFM

Mark Land, P.E., CFM

Vice President

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...