Back to Projects | Project Categories: Wastewater

Lift Station Upgrades Eliminate Backups & Increase Efficiencies: Anamosa

Anamosa 2nd Street Wastewater Lift Station Improvements

As community leaders in mature communities know, the need for new and more efficient wastewater systems is a universal concern. This issue was an unwelcome reality for many Anamosa residents near the 2nd Street lift station. Frequent sewage backups into homeowner's basements had resulted in numerous insurance claim filings and additional expenses to the city. Anamosa city leaders turned to the professionals with Snyder & Associates to tackle this concerning and costly problem. As the designers of the city's new wastewater treatment facility, our team was intimately familiar with the current municipal systems in Anamosa. After preparing upgraded facility plans and offering solutions to upgrade the aging infrastructure, our experts collaborated with city staff to determine the most cost-effective and sustainable solution.

Upgrades Increase Lift Station & Force Main Capacity While Improving Efficiency & Safety

The preferred option involved upgrading the existing wastewater lift station and portions of the adjoining sanitary sewer collection system. Lift stations are pumping stations used to move wastewater from a lower elevation to a higher elevation and eventually to a treatment facility. A new, precast structure was constructed to house the lift station apparatus. The facility's capacity was increased from 800,000 gallons per day to over 2.4 million gallons per day. To meet current Iowa Department of Natural Resources (DNR) water quality design standards, the new station is equipped with a three-pump system, where one serves as a backup. Each of the three pumps is controlled by variable frequency drives, providing the pumps the capability to handle a wide range of pumping needs, ensuring operational efficiency. The plan also doubled the size of the force main piping, which extends over ½ mile along 2nd Street to the west of the lift station.

Vertical Wastewater Filtration Prevents Clogging & Potential Damage

above ground section of vertical screen

The above-ground section of the vertical screen. The pink bag collects debris that flows towards the station.

To address the problem of unnatural items clogging the system — a point of discontent for city leaders and staff in the past — a vertical screen was installed within the pipes leading towards the upgraded station. A vertical screen system accumulates and eliminates much of the debris before it enters the lift station, a proactive measure that will extend the treatment system's longevity. Additionally, the screen is self-serviced by clearing blockages through a rotation system, eliminating the unsafe task of maintenance personnel climbing into the unsanitary wells to remove blockages.

Trenchless Installation Provides Minimal Disturbance

Installing new sewer pipes and infrastructure in established residential areas is often a high-impact process that necessitates removing sidewalks, roadways, and driveways. For this project, however, trenchless construction technology was employed. While it requires specialized equipment, trenchless technology has become increasingly popular in the engineering industry as it provides an environmentally and financially sound alternative to traditional excavation techniques. This non-invasive method produces less damage than open-cut techniques, using only a few entry and exit holes to push or pull the new sewer line into place. Most of the new sewer was installed through this method, reducing daily traffic disruptions and eliminating the disturbance of existing underground utilities. Snyder & Associates provided all construction administration and observation services for this project. Our team also relayed the city's needs to the contractor to facilitate a seamless construction process that minimized environmental impacts, continued wastewater treatment plant operations, and mitigated residential disturbance. With these upgrades in place, the Anamosa sanitary system will be able to manage expected community growth well into the future.

Client

City of Anamosa

Client Type

Project Type

Lindsay Beaman, P.E.

Lindsay Beaman, P.E.

Cedar Rapids Business Unit Leader

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country