2727 SW Snyder Blvd, Ankeny, IA 50023

1 (888) 964-2020



Navigation

Back to Projects | Project Categories: Drinking Water

Reverse Osmosis System Addition Improves Panora Water Treatment Plant

Source Water Contaminants Drive In-Depth Analysis

Utilizing a surface water treatment facility, the City of Panora in central Iowa, has encountered challenging source water characteristics ever since their plant was constructed. Drawing from the Middle Raccoon River, they’ve most notably faced fluctuating water quality problems, elevated nitrate concentrations, and taste and color odor issues from the presence of organic materials. Surface waters, which includes all above-ground water sources such as lake, pond, and rainwater, varies from source to source and season to season. This was causing frequent inconsistencies in the treatment facility’s product. In order to regain system reliability, city leaders hired Snyder & Associates to prepare a source water study. This study would analyze current quality issues and potential water source opportunities to determine the best option for the community.

Source Water Study Determines Most Cost-Effective Path

Water supply protection area sign next to river

Signs denoting source water protection areas are posted along the Middle Racoon River

Our team conducted the study during the spring and early summer months when seasonal stormwater runoff was at its peak. We found that nitrate levels in the Middle Raccoon River could exceed the Maximum Contaminate Level (MCL) set in place by regulatory agencies. Although easily fixable, nitrate wasn’t the only variable causing issues. During the normal spring snowmelt, significant levels of dissolved organics and ammonia also enter the river. The presence of these additional compounds, along with late-summer algae blooms, triggers taste and odor problems in the final drinking water product after chlorine is added for disinfection. Three alternatives for groundwater sourcing in the Panora area are the Jordan Aquifer, the Dakota Aquifer, and a shallow alluvial aquifer. While these potential water sources were assessed during our study, it was eventually determined the best and most cost-efficient course was continued use of the Middle Raccoon River with updated treatment systems.

Reverse Osmosis Water Treatment Process Addition

Once the optimal source of water was determined, Snyder & Associates developed a facility plan that analyzed all aspects of the community’s water system. This extensive document included detailed proposals for phased improvements to the city’s drinking water system, along with the recommendation to add a Reverse Osmosis (RO) water treatment process. Our team conducted an initial reverse osmosis pilot study on a reduced scale to ensure a successful final product. Upon completion and approval from the Iowa Department of Natural Resources (DNR), we moved to design a full-scale reverse osmosis treatment system expansion. The reverse osmosis method provides the city with a cost-effective way to remove ionic and organic impurities such as total dissolved solids, heavy metals, organic pollutants, viruses, bacteria, and other dissolved contaminants without the need for regeneration chemicals. The efficiency of this method is due to the reverse osmosis membrane at the heart of the system. This membrane is so fine that virtually nothing but pure water molecules can squeeze through, eliminating unwanted source water features. The new reverse osmosis membrane and support equipment were able to be housed in a building addition on the south side of the existing treatment plant. Additionally, a new diesel engine generator was purchased to provide emergency power to the facility. The plant’s gravity filter media was also replaced with new media, including an activated carbon cap to control taste and odor. Upon completion of construction and system installation, we provided operational guidance and helped city staff incorporate the improvements into its existing process. With these upgrades, the system can now control chemical contaminants that present a threat to public health and produces a higher quality of water for Panora residents. These cost-effective improvements to the existing water treatment facility avoided increased expenses associated with constructing an entirely new treatment plant. The upgraded facility is positioned to continue serving the community of Panora for years to come.

Client

City of Panora

Client Type

Project Type

Darin Jacobs, P.E.

Darin Jacobs, P.E.

Water Resources Work Group Leader

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country