2727 SW Snyder Blvd, Ankeny, IA 50023

1 (888) 964-2020



Navigation

Back to Projects | Project Categories: Development | Stormwater

Challenging Site Considerations for New Fuel Blending Facility

For over 55 years, Kwik Trip convenience stores have operated in the State of Wisconsin. Now, with over 500 stores, their reach stretches into Minnesota and beyond. In 1993, Kwik Trip introduced the Kwik Star family of stores in neighboring Iowa. Owning their fuel blending facilities allows the company to efficiently switch between winter and summer fuel blends. Recent acquisitions found the company in need of a new blending facility in the Madison area. Snyder & Associates was retained to create a site plan for this new location in the Village of McFarland.
Blending facility

Our team assisted Kwik Trip leadership in deciding which location would be best suited and most cost-effective for the blending facility.

Construction of the new fuel blending facility was slated for an industrial-zoned section of McFarland with numerous wetland areas, high groundwater, poor soils, and challenging topography with which to contend. With two potential lots to choose from, our team assisted Kwik Trip leadership in deciding which location would be best suited and most cost-effective for the blending facility.

Creative Design Resulted in Limited Wetland Disturbances

Despite choosing the best site, there were still challenges that needed to be overcome before the construction of the facility could proceed. Foremost was the existence of a wetland across the southern edge of the lot that split the property into two sections. Our team was able to turn this problem to their advantage by creating a wet pond to the south of the wetland. To divert stormwater runoff to the new pond, a retaining wall was built to elevate the site and direct the runoff over the wetland area. While this creative design practice resulted in limited disturbance to the wetland section, the work still required a wetland fill permit from the Wisconsin DNR and the Army Corp of Engineers. Our team worked diligently to stay under the 10,000 square foot threshold for obtaining a general wetland fill permit. Due to the high water table on the site and the lack of available sanitary sewer service in the area, providing sanitary facilities to the staff building was also a challenge. Our designers opted to use holding tanks as the most cost-effective measure to service the building. This new fuel blending facility allows Kwik Trip to service their stores all across southern Wisconsin. While the creative planning work by Snyder & Associates turned a challenging building site into a successful project.

Client

Kwik Trip

Client Type

Project Type

Scott Anderson, P.E.

Scott Anderson, P.E.

Civil Engineer

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country