Bettendorf City-Wide Signal Retiming Project Improves Traffic Efficiency

With a population that has steadily increased over the last three decades, the City of Bettendorf is constantly looking at ways to improve its traffic infrastructure. One component of that equation is having properly timed traffic signals that work in conjunction with one another, keeping vehicles and pedestrians moving safely and efficiently. Systems not operating at optimal levels can result in more stops, longer delays, overconsumption of fuel, excess pollution from emissions, and frustrated drivers.

To minimize those issues in their community, Bettendorf city leaders retained the services of Snyder & Associates to update traffic signal timing and coordination plans at 54 traffic signal installations along numerous corridors throughout the city. An additional four signalized intersections in the Cities of Davenport and Riverdale and one unsignalized intersection in Bettendorf were also included in the modeling and analyses.

The project also included the preparation of an Intelligent Transportation System (ITS) Master Plan for the city. This plan was devised to provide a framework for future signal and communication improvements to be integrated into their capital improvement planning. The plan will ultimately help prepare the city for seamlessly integrating advanced safety and operations technologies into their transportation infrastructure when needed.

Broad Study Area Creates Coordination Challenges

This expansive project focused on data collection, review of existing traffic signal timings, and the development of traffic analysis and traffic signal timing models. Additionally, our team was tasked with preparing timing plans, performing field reviews of those implemented timings, and identifying necessary adjustments. Travel time studies were also used to gauge the improvements of retimed signals.

Our team was faced with numerous challenges on this project, among them was collecting the extensive traffic count data needed, covering the large-signal network, and addressing the variable needs for the many different intersections and corridors. To overcome these challenges, our team made wise use of sub-consultants where possible and city-provided videos for traffic count data collection. This approach saved valuable time and resources, ultimately saving money for the city.

Additionally, we used a systematic approach to determine timing needs, dependent upon the time period, for each intersection. Our engineers also divided the signal network into five independent zones based on coordination and cycle length needs. Close coordination with city staff ensured that we met their specific needs concerning all timing adjustments. Our completed ITS Master Plan was provided to the city in geographic information system (GIS) format for simple and seamless integrated use by city staff.

Updated Timing Plans Result in Major Improvements

Street-Light-Data

Streetlight Data uses smartphone sensors to collect travel data.

Based on traffic modeling, detailed timing plans were prepared and provided to the city for implementation. The new timings were implemented, with observation and adjustments being coordinated over a several-month period. Travel time studies performed after the updates have shown an 11.4% overall reduction in travel times. Six corridors in the study had peak period delay reductions of between 20% and 73%, while the overall delays along the corridors were reduced by 22.9%. Our team’s use of StreetLight Data for “before” and “after” travel time analysis further reduced costs for the city.

This vast project has taken tremendous strides in helping the City of Bettendorf streamline and upgrade its bustling traffic flow. The improvements put in place by the Snyder & Associates team will help them adapt to the ever-changing transportation needs of the community.

Client

City of Bettendorf

Client Type

Project Type

Tony Beos, P.E., PTOE

Tony Beos, P.E., PTOE

Traffic Engineer

Related Projects

NE 51st Avenue intersection along US 69 reconstruction project.|intersection with traffic lights|Intersection at NE 70th Avenue intersection along the US 69 reconstruction project.|Intersection of NE 60th Avenue near the Polk County Sheriff's Office along US 69 reconstruction.|median under construction|LiDar image of US 69 reconstruction|Snyder & Associates Transportation experts

US 69 Reconstruction: Paving the Way for Future Growth in Ankeny

In the heart of unincorporated Polk County, a bustling two-lane corridor known as US Highway 69 (NE 14th Street) has long been a critical lifeline connecting Des Moines...
newly constructed roadway intersection|Road traffic transitions into roundabout|Improved traffic flow due to new corridor|Snyder & Associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

Tower Terrace Road Upgrades Fill Gap in Northern Connector Initiative

Nearly two decades ago, planners for Linn County and several surrounding communities — including Cedar Rapids, Hiawatha, and Marion — began laying the groundwork for an...
|||Aerial rendering of Hickman and Interstate 35/80 diverging diamond interchange.||Street level rendering of Hickman and Interstate 35/80 diverging diamond interchange.|||Rendering of pedestrian tunnel underneath Interstate 35/80 at Hickman Road diverging diamond interchange.|Bridge abutments design treatment underneath Interstate 35/80 diverging diamond interchange bridge.|||Median treatment rendering underneath Interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

Progress on the Interstate 35/80 & U.S. 6 Diverging Diamond Interchange Upgrade

The exponential growth of communities, particularly in the western suburbs of Des Moines, has been nothing short of remarkable. The population of Waukee, for example,...
||||

Cedar Heights Drive Reconstruction Continues Cedar Falls Corridor Upgrades

For several years, the Cedar Falls community has been expanding its transportation network along the southern edge of town, including the Greenhill Road corridor. This...
Intersection map||Map of US 30 Iowa

Improved Access & Safety Needs Prompt Interchange Operations Report

A wide-reaching planning study started in the 1980s by the Iowa Department of Transportation (DOT) gave priority status to the widening of U.S. Highway 30 across much...
|aerial view of us 61 study area|vehicles entering a signalized intersection|aerial view of US-61 and mason road proposed corridor improvements|

Corridor Study of U.S. Highway 61 through Burlington Emphasizes Safety & Efficient Operations

The Iowa DOT tasked the traffic professionals with Snyder & Associates to conduct a traffic study along the busy, U.S. 61 corridor.

ADA complaint new sidewalk|new ADA compliant sidewalk with red domes by street|construction of new ADA compliant sidewalk surrounded by dirt|non-compliant sidewalk|||sidewalk turning before tree|

Iowa DOT Sidewalk Improvement Project Requires Extensive Right-of-Way Services

Multidisciplinary Service Offering is Just the Ticket for ADA Compliance Project In their ongoing efforts to meet the compliance requirements of the Americans with...
railway crossing with paved median||Railroad intersection|Clinton

Quiet Zone Improves Quality of Life for Clinton Recreation Hub

The professionals with Snyder & Associates were brought in to help guide the complex process of creating a quiet zone in Clinton.

sky view of farmland and interstate|waukee street design poster|black and white street design plans|multicolored roadway map

Waukee Street Design Guide Provides Detailed Roadway Plan for Community

The transportation planning experts with Snyder & Associates recently completed a Street Design Guide and Major Streets Plan to provide Waukee with a roadmap for...
|||lush green stormwater culvert|black and white map with project area outlined in red|traffic backed up bumper to bumper|||||

Iowa Highway 17 Realignment Study Leads to Overpass Construction

Snyder & Associates was tasked by the Iowa DOT with performing a realignment study that would assess the practicality of constructing a grade separation over the...

more than 45 years

Serving Clients Around the Country

DB+