Wastewater Asset Management Planning: Des Moines WRA Sanitary Sewer Trunk System

Preventative Sanitary Sewer System Maintenance Promotes Cost-Savings

Preventative maintenance ensures sanitary sewers remain in proper working condition and helps prevent potential problems. Recognizing the benefits of a proactive approach, the Des Moines Metropolitan Wastewater Reclamation Authority (WRA) initiated an evaluation of their trunk sanitary sewer system.

As part of a multi-tiered wastewater collection system, large trunk sewers convey waste to the wastewater treatment plant utilizing smaller tributaries. On this project, the inspected trunk system included sewers installed before 2004. The oldest segments dated back to pre-1960, so the potential for deficiencies was a concern.

Through the evaluation, the WRA and Snyder & Associates aimed to establish a baseline for the overall health of the trunk system and use it in creating a wastewater asset management plan.

GIS & MSI Technology Assist with Sanitary Sewer Inspection

Inspections were conducted in two phases over 18 months. During the first phase, approximately 800 sewer manholes were structurally inspected and assessed for inflow and infiltration (I/I). A Geographic Information System (GIS) network was created to record the results, providing a user-friendly database to locate assets, document maintenance, and reference system conditions. This included all manhole structure inspections with corresponding photographs.

Multi-sensor inspection technology utilizes an HD camera, LiDAR, and sonar to create 360-degree pipe profiles during sewer system assessments.

Multi-sensor inspection technology utilizes an HD camera, LiDAR, and sonar to create 360-degree pipe profiles during sewer system assessments.

The field investigation procedure began by assembling WRA mapping information for sewers and access structures, along with original construction and as-built drawings. Sewer manholes were surveyed utilizing GPS to obtain accurate locations. Most structures were determined to be in fair to good condition. Common issues included cracked or broken mortar seals and chimneys, offset frames, and broken or missing cover bolts.

During the second phase of inspections, nearly 60 miles of gravity sewer (15 inches to 96 inches), 13,000 feet of force main (12 inches to 24 inches), and 7,000 feet of siphon piping were evaluated using multi-sensor inspection (MSI) equipment.

For large diameter sanitary sewer trunks and interceptors, a visual-only inspection can be unreliable. With critical usage requirements, it’s not ideal to leave decision-makers with the tough task of evaluating which pipes might appear to be deteriorating. After a variety of inspection technology was considered, MSI was chosen for its ability to detect pipe corrosion severity during active flow.

MSI creates a 360-degree profile of pipes using a high-definition (HD) camera, LiDAR, and sonar equipment. The HD camera allows for a detailed visual inspection of each segment and records defects in a NASSCO Pipeline Assessment Certification Program (PACP) database. It also has a photo stitching process that allows the viewer to pan or rotate at any point during an inspection. The LiDAR information reveals corrosion characteristics to quantify the pipe wall loss of each segment, and sonar collects information from below the water line to tabulate debris volumes and estimate necessary cleaning needs. Digital reports and images from the MSI provide significant detail to assist in ranking the severity of defects.

Risk-Based Approach to Creating a Wastewater Asset Management Plan

Utilizing the data collected from the inspections, our wastewater engineering team utilized risk analysis methods to assess the health of the network and create an asset management plan for sewer rehabilitation. With costly rehab decisions at stake, risk management is a tool used to prioritize wastewater collection system resources for rehabilitation.

Sanitary sewer risk analysis is comprised of two factors—the likelihood of failure (LOF) and the consequence of failure (COF).

The LOF represents the sewer’s physical condition. The data collected data from the MSI was utilized to determine the likelihood of failure for each sewer segment. The likelihood of failure includes two components: overall pipe rating (OPR) and corrosion volume per inch diameter-feet. The (OPR) is a scoring system that ranks individual pipe segments by the visual defects that were recorded during the inspection. Overall pipe ratings by segment are placed in a matrix to calculate the likelihood of failure.

The COF considers the impact on the entire system and surrounding community if a specific segment were to fail. When wastewater utility assets fail without notice, the repair costs are typically exponentially higher when compared to planned rehabilitation. Similar to the likelihood of failure, a matrix system is used to assign weights and rate each segment.

By combining both factors (LOF and COF) into one (Risk), weak points in the system are identified with greater accuracy and more effectively prioritized for repair. This methodology ensures that dollars are spent cost-effectively and rehabilitation schedules are optimized. It also helps prevent environmental and human health implications.

To calculate risk, the LOF and COF ratings are multiplied together. Wastewater utility assets are prioritized based on the resulting risk rating. Risk scores are then sorted from high to low. Pipes associated with a higher risk score represent the primary candidates for rehabilitation. Once sorting is complete, a curve is generated and risk categories are defined which includes lowest, lower, moderate, higher, and highest risk.

Approximately 121 segments (or 20 percent) of the WRA’s sewer system were classified as high- to higher-risk assets. The areas that currently present the highest risk lie within the Southwest Outfall and South Side Interceptor located south of downtown and parallel to the Des Moines River. These sewers act as the lifeline of the metropolitan sewer system.

Wastewater Asset Management Plan for Sanitary Sewer System

As a result of the sewer system assessment, two phases of pipelining are recommended. Both phases of sewer lining will address several of the highest-risk segments while presenting the best opportunity to meet budget goals. The sewers in this area have particularly flat slopes that result in low velocities and create an ideal environment for corrosive conditions. Priority lining will prevent further deterioration of the sewer and ensure that assets are repaired before unexpected failures occur.

The design is currently underway for both phases by the Snyder & Associates’ team with lining anticipated to be completed in 2021. Snyder & Associates continues to assist the WRA in identifying other areas of priority and planning additional phases of rehabilitation for future programming.

Services provided by Snyder & Associates include construction administration, GIS and asset management, GIS mapping and analysis, along with wastewater system analysis and planning.

Client

WRA Wastewater

Client Type

Project Type

Wes Farrand, P.E.

Wes Farrand, P.E.

Civil Engineer

Related Projects

exposed siphon at omaha papio creek|drone map of the Papio Creek in Omaha NE|papio creek stream

Safeguarding Critical Infrastructure and Water Resources: Omaha’s “Papio” Creek

In March 2019, the City of Omaha faced a significant threat to its critical infrastructure under West Papillion Creek (known to locals as Papio Creek). A disastrous...
Leachate Disposal Lift Station at Des Moines County Landfill|excavator digging trench for sewer force main|Leachate Disposal Submersible Wet Well Lift Station|Leachate Disposal Construction of Force Main|Leachate Disposal Wastewater force main Cleanout

Leachate Disposal Solution for Des Moines County Landfill & the City of West Burlington

For many years, the Des Moines County Landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
Slater wastewater treatment greenhouse at sunset|Wastewater lagoon with aeration bubbles|Greenhouse and settling pond|Aerial view of large lagoon cell drained for construction|Slater's new greenhouse for wastewater treatment|Inside Slater greenhouse with empty cells|Inside of slater wastewater treatment plant with algae belts.|Slater wastewater treatment plant ribbon cutting|visitors walk inside the new Slater greenhouse and view RAB belts|aerated lagoon at the slater wastewater treatment plant|RAB belts at the Slater wastewater treatment plant

Slater Incorporates Algae to Treat Community Wastewater

For years, the City of Slater used an aerated lagoon system as its primary wastewater treatment method. However, increased awareness of pollutants and their impact on...
blue and red map of sewer system service area|corroded manhole|lime green map of pleasant hill sewer system and neighboring communities

Growth in Pleasant Hill Leads to Sanitary Sewer System Review

Snyder & Associates was tasked with conducting a Sanitary Sewer System Review, identifying long-term system and infrastructure upgrades.

square concrete new lift station|above ground section of vertical screen|large machine used to bore holes and make way for pipe|trenchless construction|lead tubing being placed before pipe|concrete tube that will eventually house pumps|square concrete new lift station

Lift Station Upgrades Eliminate Backups & Increase Efficiencies: Anamosa

Anamosa 2nd Street Wastewater Lift Station Improvements As community leaders in mature communities know, the need for new and more efficient wastewater systems is a...
large rectangle wastewater lagoon pond|snowy fields with school in distant background||large dirt hole during lagoon construction|concrete walls of the lagoons lift station placed in the ground

Starmont High School’s Wastewater Dilemma Requires Speedy Solution

Thanks to positive client relationships and word-of-mouth recommendations, Snyder & Associates was hired to find a viable wastewater solution for a high...
aerial view of two large blue lagoons and operation buildings||waterside view of lagoon and gravel shores|metal walkway between two lagoons. One is rough and one is smooth.||

West Burlington’s Wastewater Treatment Plant Upgraded to Meet Current NPDES Requirements

Snyder & Associates wastewater engineers were enlisted to develop a plan for remodeling and expanding West Burlington’s existing wastewater treatment...
car sprays water while driving through a large puddle||car sprays water while driving through a large puddle|view of downtown skyscrapers at then end of a main street|satellite map with project area outlined in red|construction work in a deep trench

Des Moines’ Sewer Separation Initiative Prevents Flooding, Backups & Overflows

Antiquated Stormwater & Wastewater System Fails to Meet New Standards When the City of Des Moines wastewater system was initially constructed, viable methods for...
Inside of the Disinfection-Flow Equalization Tank.|Inside of the SBR tank looking at the aeration piping system.|Inside of treatment tank looking at piping

Custom Wastewater Treatment Solutions for Growing Industrial Client

Working with this industrial client for over ten years, Snyder & Associates continues to provide the most cost-effective, environmentally-sound, and...
cement building with blue roof|grey wall of electrical pannels|multiple pumps in cement room|three oval motors in a row|looking down on multi-level facility floors|

New Pump Station Expands St. Joseph’s Eastside Sewer System Reach

The City of St. Joseph selected Snyder & Associates to replace the outdated, undersized Easton Road pump station with a newly designed wastewater facility in an...

more than 45 years

Serving Clients Around the Country

DB+