3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond

To address aging infrastructure and improve overall street conditions, the City of Belmond partnered with Snyder & Associates to lead the design and construction of the 3rd Street Northeast Reconstruction – Phase 2 project. The improvements focused on a 1,775-foot corridor, including 3rd Street NE from 1st Avenue NE to 6th Avenue NE and a portion of 2nd Avenue NE between 3rd and 4th Streets NE. This project delivered significant upgrades to both surface and subsurface infrastructure, improving reliability and safety for residents, businesses, and pedestrians.

Full Corridor Reconstruction with Utility Upgrades

The project involved the complete removal and replacement of deteriorated pavement, sidewalks, and driveway approaches. All pedestrian facilities were upgraded to meet ADA compliance, improving walkability and safety throughout the neighborhood. Beneath the roadway, the reconstruction included replacement of critical underground infrastructure, such as water mains, sanitary sewers, and storm sewer lines. Excavation depths of up to 10 feet were necessary to install the new sanitary sewer and water main systems. These improvements not only addressed aging utilities but also provided enhanced service reliability for homes and businesses along the corridor.

Improved Stormwater Management

To reduce the risk of localized flooding and improve overall drainage capacity, the project team upgraded the storm sewer system with additional street intakes and larger-diameter piping. These enhancements were designed to handle increased runoff more effectively during storm events, supporting the city’s long-term stormwater management goals.

Phased Construction and Community Coordination

Construction was carefully staged to maintain access to homes and businesses throughout the duration of the project. Coordination with utility providers allowed for the proactive relocation of gas, electric, and communication lines prior to major roadway work. Public engagement was a key focus, with residents receiving advance notice of sidewalk closures and temporary water service disruptions to minimize inconvenience.

Long-Term Community Benefits

By integrating roadway, utility, and pedestrian improvements into a single, well-coordinated effort, the 3rd Street Northeast Reconstruction – Phase 2 project has delivered a modern, durable transportation corridor that meets current standards and anticipates future community needs. The project reflects the City of Belmond’s commitment to infrastructure investment and quality of life for its residents.

Client

City of Belmond

Client Type

Project Type

Andy Burke, P.E.

Andy Burke, P.E.

Civil / Transportation Engineer

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country