2727 SW Snyder Blvd, Ankeny, IA 50023

1 (888) 964-2020



Navigation

Back to Projects | Project Categories: Stormwater

Neighborhood Receives Much-Needed Stormwater Drainage Improvements: Fort Dodge

Right-Sizing Stormwater Drainage System Key to Residential Neighborhood Project

The tidy, residential neighborhood situated in the south-central area of Fort Dodge is densely populated with single-story, single-family homes. Due to undersized storm sewer pipes, this working-class neighborhood (bordered by 9th Avenue South on the north side and 15th Avenue South, and South 22nd Street to the west and the Union Pacific Railroad yard in the east) has been plagued by street flooding during periods of heavy rain for many years. Snyder & Associates developed a plan for installing larger sewer pipes in the area and providing a more direct egress for stormwater into Gypsum Creek to the east.

Multi-Phase Project to Improve Drainage Issues

two metal stormwater inlets before concrete is added around them

Storm drain replacements in certain locations were sized to handle the stormwater.

This extensive effort will initially focus on South 24th, 25th, 26th, and 27th Streets between 14th and 15th Avenues South. Subsequent phases of the project will continue storm sewer pipe replacement, working to the north through the neighborhood. New storm sewer pipes will also be added along 15th Avenue South to carry stormwater to Gypsum Creek. To complete this stage of the project, sections of 15th Avenue South will be closed during construction. However, the closure will be timed to coincide with the replacement of a bridge on the same road to the east. To keep total project costs in check, the city requested the storm sewer replacement plan have minimal impact on existing roadway pavement in the area. This requirement results in limited areas where street pavement needs replaced. With this parameter in mind, our team created a plan with storm sewer offsets behind the existing curb. This allowed for the installation of new pipes without requiring roadway removal. Additionally, construction activities were confined to the existing rights-of-way where feasible to further help minimize expense. This extensive project is slated to take several construction seasons to complete. The thoughtful staging plan is designed to limit disruptions to local traffic and homeowners in the area, while the new storm sewer drainage system will reduce the frequency of flooding events. The Snyder & Associates team was responsible for the initial design, as well as the ongoing construction observation of the project.

Client

City of Fort Dodge

Client Type

Project Type

Wade Greiman, P.E.

Wade Greiman, P.E.

Transportation Business Unit Leader

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years