Stream & Sanitary Sewer Protection: Fourmile Creek

Engineering Excellence Honor Award, Special Projects Category, ACEC-IA, 2019

Improving Ecological Stream Functions & Habitat

The WRA Fourmile Creek Improvements-North of Broadway project protects vital infrastructure while fostering improved ecological functions and habitat. Traditional infrastructure protection with riprap at single bends was abandoned because of the low ecological value. Generally speaking, the ecological value of an organism, natural resource, activity, and other components of natural ecosystems are defined by the benefits they provide to support native life. Integrating ecological lift techniques within this complex project has garnered a 2019 Engineering Excellence Honor Award from the ACEC-IA. This project began when streambank erosion at several Fourmile Creek locations put sanitary sewer infrastructure at risk. Snyder & Associates’ experience with environmental engineering, fluvial processes, and stream restoration prompted the Des Moines Metropolitan Wastewater Reclamation Authority (WRA) to seek our assistance on a creative solution to address the issue. Collaboration was essential in creating a vision for the project as well as identifying project priorities and opportunities. By reading the river and using natural channel design concepts, this project transformed an environmental liability into an improvement that:

  • Boosts water quality through sediment loading reductions and vegetative filtering of nutrients
  • Strengthens the safety of stable/non-vertical banks
  • Reduces the risk of downstream flooding
  • Creates a user-friendly recreational environment
  • Enhances the aquatic habitat for fish and other living organisms

Funding Assistance Strengthens Project Impact

WRA embraced the opportunity to leverage SRF Sponsored Project funding associated with their infrastructure improvement loans. As a result, they expanded a limited bank stabilization project to protect their sanitary sewer infrastructure into a comprehensive stream restoration approach that benefits longer reaches. Through several applications, we helped the WRA secure $4.2 million in funding assistance to leverage their limited traditional funds. We were also able to successfully coordinate with multiple agencies and partners to facilitate right-of-way acquisition and meet funding requirements. Over 8,000 feet of stream restoration was prioritized in three Fourmile Creek reaches—north of Broadway Avenue, north of Euclid Avenue, and south of University Avenue—to reduce severe bank erosion and channel degradation, and protect sanitary sewer infrastructure.

Client

Des Moines Metropolitan Wastewater Reclamation Authority (WRA)

Client Type

Project Type

Jeff Walters, PWS

Jeff Walters, PWS

Environmental Sciences Work Group Leader

recent projects & completed jobs

Related Projects

Water

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower with a new 1.0-million-gallon elevated storage tank, increasing capacity fivefold over the existing 200,000-gallon tower built in […]

Water

Radial Collector Wells Strengthen Water Supply for Atchison, Kansas

Snyder & Associates helped Atchison develop new radial collector wells, improving raw water capacity, reliability, and long-term drinking water resilience.

Aerial rendering of the Grand Avenue roadway extension in West Des Moines|Map of National Flood Hazard Layer of the project area|Image of construction taking place for Grand Avenue extension in West Des Moines Iowa with construction workers and cement trucks in the background|Newly poured roadway with road crew working in the background.|Image of construction taking place for grand avenue extension in West Des Moines Iowa|New bridge over Johnson Creek with earthwork still to complete underneath.|View of the Johnson Creek Bridge along Grand Avenue with the new monuments installed on either side.|Custom-designed monuments for the City of West Des Moines

Structural, Transportation, Water

Grand Avenue Extension in West Des Moines Opens Additional Area for Development

To provide access to Microsoft's new data center and open additional area for development in southwest West Des Moines, city leaders contracted with Snyder and Associates and our structural engineering subsidiary, Shuck-Britson, to design the roadway extension of Grand Avenue, […]