2727 SW Snyder Blvd, Ankeny, IA 50023

1 (888) 964-2020



Navigation

Back to Projects | Project Categories: Stormwater

Walnut Creek WMA: A Holistic Approach to Watershed Management

Walnut creek map

Walnut Creek Watershed encompasses a large portion of the Des Moines Metro. Map credit: Polk SWCD

The Walnut Creek Watershed is one of the most critical watersheds in Iowa. The creek, along with its numerous tributaries, spans 97 miles and drains 53,000-acres across two of the state’s most populated counties: Dallas and Polk. Flowing into the Raccoon River less than a mile from the Des Moines Water Works’ intake valve, Walnut Creek becomes a source of public water supply serving nearly half a million users.

In response to concerns regarding high bacteria and nitrate levels, turbidity, flash flooding, and streambank erosion, the Walnut Creek Watershed Management Authority (WMA) was formed. This WMA works to ensure that concerns are handled on a holistic level, contrary to how similar issues were dealt with in the past. Previously, water quality and flooding concerns were offered site-specific solutions with little consideration given to finding the root cause of the problem. The Walnut Creek WMA provides a mechanism for cities, counties, Soil and Water Conservation Districts (SWCDs), and other stakeholders to work together to create positive change.

Snyder & Associates Experts Assist in Creating a Successful Watershed Management Plan

As a vital contributor to the watershed management group, Snyder & Associates provided modeling and mapping services to ensure the floodplain delineation of Walnut Creek was as accurate as possible. This detailed map gives communities and residents a more comprehensive depiction of risk profiles along the creek corridor. With this knowledge, city leaders and homeowners can take action to avoid potential property damage and unwarranted financial expenditures.

Understanding that active participation helps translate stakeholder needs into organizational goals, our team was directly involved in the stakeholder engagement process. These invested individuals from various organizations have a wide variety of backgrounds and were selected to provide input and guidance regarding the WMA’s goals. A shared motive was created through group meetings, allowing the stakeholders to confidently make decisions that pushed toward a successful outcome.

Hydrologic and Hydraulic Modeling Outline Action Plan for Vital Watershed

In the field of water resources engineering, hydrologic and hydraulic modeling are two separate tools used for water source analysis. The hydrologic and hydraulic models allowed our professionals to evaluate the impacts of various improvement options and the advantages/disadvantages of each scenario. Snyder & Associates used their expertise to complete this in-depth assessment, updating both model types for the Walnut and North Walnut Creek Watersheds.

The existing hydrologic model for the watershed was last evaluated in the ’90s, since then substantial development has occurred throughout the area. This specific model type focuses on rainfall and defining regional runoff. Without current updates, city planners were left with outdated data and an inaccurate representation of water trends. Therefore, accurately assessing the current development within the watershed was paramount for calibrating the hydrologic model. Developed by the US Army Corps of Engineer’s Hydrologic Engineering Center (HEC), the modeling performed by our team updated hydrology for the entire watershed area using a Geospatial Hydrologic Modeling System (HEC-GeoHMS). These processes gave insight into predicted responses to changing stresses, such as increases in precipitation, and formed a solid foundation for future mitigation projects.

In the same fashion, the existing hydraulic model also required an updated review. By conducting consecutive studies, our team was able to take advantage of the new hydrologic model’s data and information. Additionally, this update incorporated current field conditions and new Iowa Statewide Light Detection and Ranging (LiDAR) data, which was used as the base for the Digital Elevation Model (DEM). The completed hydraulic study updated figures for over ten miles of the watershed area using specific methods in the Geospatial River Analysis System (HEC-GeoRA).

Snyder & Associates compiled the final data from each study into a report for a Letter of Map Revision (LOMR) submittal to the Federal Emergency Management Agency (FEMA). This final summary provides the city with a tool that enhances and promotes effective community planning. More importantly, the data allows current and future residents to be more accurately informed regarding their flood risk. Moving forward, the main goals of the Walnut Creek Watershed Management Authority will focus on eliminating future risks while mitigating current issues. Snyder & Associates will continue to offer their expertise for this worthwhile watershed management endeavor.

Client

Walnut Creek Watershed Management Authority (WMA)

Client Type

Project Type

Mark Land, P.E., CFM

Mark Land, P.E., CFM

Vice President

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country