2727 SW Snyder Blvd, Ankeny, IA 50023

1 (888) 964-2020



Navigation

Back to Projects | Project Categories: Buildings

Iconic Webster County Courthouse Clock Tower & Roof Restoration

Clock-Tower

Teams constructed a scaffolding system in preparation for removing the dome.

The Webster County Courthouse was dedicated in November of 1902 and is currently listed on the National Register of Historic Places as both an individual building and as a contributing building to the Fort Dodge Downtown Historic District. After suffering minor storm damage in 2018, engineers from Shuck-Britson, a subsidiary of Snyder & Associates, performed a detailed inspection on the courthouse and its iconic clock tower that uncovered extensive roof and interior structural damage.

In consultation with Webster County officials and after reviewing historic photos, the design team determined that many prominent architectural features had been removed over the years during regular maintenance of the building. County leaders expressed a desire to restore many of the original features as appropriate. As the lead structural engineers on the design team, the Shuck-Britson crew provided recommendations and restoration plans to bring back much of the courthouse’s prior charm during the repair process.

Preventive Structural Repairs & Water Infiltration Measures

Webster County Courthouse

Project Manager Kevin Binder was honored with a ceremonial square, level and plumb at the Rededication Ceremony.

Our team’s structural assessment showed minor damage related to the stability of the structure, however, maintenance and extensive repairs were needed to stop water infiltration and further deterioration of the wooden interior structure.

These repairs included the complete removal and reconstruction of the clock tower and dome skin to create access for the structural repairs and to repair copper materials that had significant damage. The clock tower repair included the addition of a dual barrier waterproofing system consisting of membrane-covered steel and copper exterior. The mansard roofs and gables were covered with manufactured slate tiles, while the low-slope roof sections received a new membrane system, as well.

The mansard roofs saw the reinstallation of their copper ridges and cresting elements for water protection and to match the historic architectural accuracy. The plan also called for the complete removal and reconstruction of the building’s gutter system, with the reinstallation of historic copper elements for the fascia and decorative elements that also corresponded with historical accuracy. Finally, the central skylight system was removed and replaced using modern materials and included resizing the skylight to match the original architectural effect.

Our team designed and coordinated the repairs for this Iowa landmark and worked closely with county officials, architects, and contractors to perform the restoration of the courthouse’s clock tower, skylight, and roof. These weather-tight repairs are expected to extend the life of this historic building for many generations to come.

Client

Webster County

Client Type

Project Type

Craig German, P.E.

Craig German, P.E.

Structures Work Group Leader

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country