2727 SW Snyder Blvd, Ankeny, IA 50023

1 (888) 964-2020



Navigation

Back to Projects | Project Categories: Development

Kwik Trip Store Location Requires Extensive Land Development

DeForest Convenience Store Site Services Truck Traffic near Major Interstate

vehicle parked next to fuel pump in front of a recently complete kwik trip in deforest wisconsin

The newest Kwik Trip location in DeForest serves the bustling interstate traffic and the local community.

The Wisconsin-based convenience store chain, Kwik Trip, has seemingly been in a perpetual state of expansion for more than a decade — building new stores at a rapid pace across the upper Midwest. For many of these new store locations, Kwik Trip has turned to the civil engineers with Snyder & Associates to develop the site plans. One of their most recent additions saw the construction of a new store along County Highway V in the community of DeForest. Located blocks to the east of a busy Interstate 90/94 interchange, this new store integrates a dual-bay car wash, expansive tractor-trailer parking area, a separate diesel fuel station, and a wide, detached entrance for semi-truck traffic. Our team was tasked with creating an environment that blends seamlessly with the surrounding urban landscape while also servicing pedestrian, car, and truck traffic. To accommodate this goal, the site required extensive preliminary development along with a host of other comprehensive services provided by the professionals from Snyder & Associates.

Public Road Extension & Secondary Water Main Loop Highlight Site Development

At the outset of the project, our team completed a certified survey map (CSM) process in order to combine multiple lots. A CSM is required by the State of Wisconsin when combining two or more parcels. This building site also required the addition of a new access road along the northwest portion of the property. Snyder & Associates engineers created plans to extend Holiday Court over 800 feet to connect to the rear of the Kwik Trip parking lot and included a new sidewalk along the south side of the roadway. This access road also creates a route for exiting truck traffic to safely return to the interchange from the store’s parking lot. Additionally, the water main was extended to provide water for the site and to provide a looped connection for the Village’s water system. This required the construction of over 1,000 feet of new water main and included boring under County Highway V to complete the connection. The strategic use of attractive landscaping in the right-of-way and parking lot islands helps to enhance the site and provide aesthetic balance.

Stormwater Management Techniques & Sensitive Cold Water Community Accommodations

bio-retention basin enhances stormwater mitigation satisfy local requirements

Retention basins and wet ponds were used to manage stormwater runoff.

Before the design process began, our team recognized the need for enhanced stormwater mitigation efforts to satisfy local requirements. To meet these requirements, one bio-retention basin and two wet ponds were utilized along the south and east edges of the property to allow for stormwater detention and the use of native vegetation and pollinators to assist with stormwater management. The existence of a substantial wetland area to the north and east of the site also required special consideration by the designers. A sensitive cold water community in the nearby waterway contained several fish species, including trout, which needed to be protected from the possible increased temperatures of stormwater runoff. To accommodate this situation, the designers developed plans to install a rock crib on the east side of the property. A rock crib consists of a trench filled with rock that is buried several feet below ground where the soil stays cool year-round. Warm rainwater from the road and parking lot flows in and is cooled by the rocks before it flows out to the wetland. The rock crib is wrapped in a geotextile fabric liner to prevent the surrounding soil from mixing with the rocks. By diverting the rainwater through the rock crib, the temperature of the water is cooled.

Numerous Services Streamlines Land Development Design Process

The Snyder & Associates team not only provided a site development plan for this project but also the required survey work which was performed by our in-house survey crew. Close coordination with all utility providers in the area ensured a smooth construction process. Our comprehensive approach to site development creates project efficiencies that are unmatched in the industry. Our team has been instrumental in helping Kwik Trip maximize its development efforts for many years. The professionals at Snyder & Associates have extensive experience working with commercial and residential developers nationwide and can provide the survey, analysis, and planning services necessary for any size development project.

Client

Kwik Trip

Client Type

Project Type

Scott Anderson, P.E.

Scott Anderson, P.E.

Civil Engineer

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country