Iconic County Courthouse Suffers Severe Tornado Damage

In July of 2018, the historic Marshall County Courthouse was in the direct path of an EF-3 tornado. Despite its solid construction, the building suffered extensive damage, primarily to its spire, dome, and clock tower. The intense winds ripped the spire from its mounts, toppling it onto the roof below, causing further devastation. Several of the building’s chimneys also suffered differing levels of damage. Additionally, the interior of the building was inundated with water from multiple broken sprinkler lines in the attic.

OPN Architects and Shuck-Britson, a Snyder & Associates subsidiary, were enlisted to assess the damage and provide the county with a condition survey, as well as repair options for bringing the courthouse back to full functionality as quickly as possible. Our damage assessment crews used a crane and two-man basket to perform the exterior survey work. From this perch, they were able to assess the tower, dome, chimneys, and flatlock and slate roofs. One major finding was the existing wood dome structure had been severely twisted when the spire was ripped away and was damaged beyond repair.

Due to an antiquated floor plan layout and general lack of space for departments and services located within the courthouse, community leaders decided to make improvements to the building that went beyond the storm damages. The design team provided repair options that covered all of these improvements — both the exterior and interior projects.

Off-Site Dome Reconstruction & Storm Repairs

Crews prepare the tower before lowering the new dome into position.

Since the damage assessment survey determined the wood dome was not repairable, the decision was made to remove the dome entirely, build a new one off-site, and install a temporary roof in the interim. This option was the most cost-effective and practical alternative. Redesigned as an all-steel structure, the new dome was built to withstand formidable future weather events. The spire would also need to be reconstructed off-site and fit to the top of the dome after it was replaced.

The clock tower that sits below the dome has a wood panel finish covering most of the interior brickwork. Removal of several sections of the paneling revealed that no masonry damage had occurred to the interior of the tower. However, some of the boards, timber supports, and trim work around the clock needed to be replaced or repaired due to water damage or splitting. Around the exterior of the tower, trim work also needed extensive attention, and the glass covering the clock required replacement. Trim work at the roofline was targeted for repairs to ensure it’s watertight.

Numerous roof sections were also severely damaged — one section from the falling spire and others simply from the high wind. Some areas required split or broken rafters to be repaired or replaced. Sister rafters were used on one or both sides of rafters in several cases. All beams and rafters were examined and reworked where necessary to ensure a proper load path existed. After repairing all of the structural components for the interior, the entire roof requires new shingles, as well as new trim work, flashing, and gutters to return the building to a sound and weatherproof state.

Limited Interior Structural Damage Speeds Reconstruction Efforts

One bright spot from this ordeal was the discovery of no interior structural damage to the building below the dome level. Some limited cracks in the stonework were found to be in minor need of repair through a sealing process but the remainder of the interior work mainly consisted of repairing water-damaged areas and renovation work. The Shuck-Britson and OPN teams were in close coordination throughout the damage survey and design process. Work continues on the project with a substantial completion target of summer 2020.

Client

Marshall County

Client Type

Project Type

Craig German, P.E.

Craig German, P.E.

Structures Work Group Leader

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country