2727 SW Snyder Blvd, Ankeny, IA 50023

1 (888) 964-2020



Navigation

Back to Projects | Project Categories: Stormwater | Streetscapes

Streetscape Improvements Rejuvenate Historic Dundee Neighborhood

Infrastructure Deterioration in Popular Neighborhood

Native plantings were used along the entire project area.

Known as Omaha’s first suburb, the historic Dundee neighborhood dates to the early 1880s. This popular historical area features countless fine restaurants, two major parks, and an eclectic mix of residential architecture. In 2011, the Dundee District was named one of the nation’s Great Neighborhoods by the American Planning Association. After more than 130 years, however, several areas within the district needed substantial infrastructure improvements. Snyder & Associates was hired by the City of Omaha to begin the Dundee Streetscape project. The project would include the design and oversight for a series of renovations and aesthetic improvements along Underwood Avenue, between 49th and 51st Street, and along 50th Street from California Street to Webster Street. This multifaceted project site lies within the heart of the neighborhood’s business district and required our staff’s vast expertise of surveyors, civil engineers, landscape architects, structural engineers, and construction personnel.

Public Outreach Campaign Helps Guide Design Process

To jumpstart the project, our team began with an extensive planning process and public outreach campaign. This included 3D renderings, public informational meetings, and numerous business owner meetings to guide decision-makers in creating a united vision for Dundee. Numerous existing conditions were addressed as part of the planning process. These included the need for repairing pavement deterioration at many locations, more cohesive stormwater drainage and management plan improved ADA accessibility and elevation change upgrades, and the need for an attractive streetscape corridor. After our detailed review and meticulous planning, the Snyder & Associates team was able to create a pleasing balance within the corridor, resulting in a 25 percent increase in parking spaces and an even greater complete street environment, featuring:

  • 40 additional on-street parking spaces
    downtown parking spots

    40 on-street parking spaces were added to the Dundee District.

  • New sidewalks throughout the project area
  • Decorative streetlights, benches, tables, brick pavers, bike parking stations, and trash receptacles
  • Plazas areas for public gathering
  • Rain garden at 50th Street and Underwood Avenue
  • Variety of trees, shrubs, grasses, and flowers

Because all businesses in the project area needed to remain open during construction, the staging was critical. Our team worked with the contractor to monitor progress and inform businesses of current project staging and upcoming work activities to keep any inconveniences to a minimum. The Snyder & Associates team also provided preliminary design, final construction documents, and construction assistance. The entire project’s construction occurred over six months at a cost of $2.5 million, funded in partnership between the City of Omaha, private donors, businesses, and the neighborhood. The completed streetscape design project creates a welcoming, attractive public space, encouraging community growth and vibrancy.

Client

City of Omaha

Client Type

Project Type

No team members assigned to this project.

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country