Modern Facility Consolidates Iowa City Public Works Municipal Operations

2021 Small Cities/Rural Communities, U.S. Project of the Year in the structures category from the American Public Works Association I 2022 Committee on the Environment (COTE) Top Ten Award winner from the American Institute of Architects (AIA) I 2022 Top Ten U.S. architecture projects presented by London-based online architecture and design magazine Dezeen

Several Public Works Facilities Brought Under One Roof

For years, Iowa City Public Works (ICPW) utilized several sites to house different departments and equipment. With the goal of consolidating multiple departments in one centralized location, the city enlisted Neumann Monson Architects to create a plan for developing a 14-acre, city-owned tract on the south side of town. The civil engineering team with Snyder & Associates was brought on board to provide their expertise for this multi-disciplinary design project.

The resulting Public Works Master Plan called for the initial construction of a 100,000 square foot building to house the Streets and Water Departments, as well as their associated vehicles and equipment. This vast structure was constructed using highly durable, cost-effective materials that are easy to maintain. The building interior includes shop spaces, large-scale machinery storage, vehicle & equipment wash bays, and a mezzanine storage area with elevator and forklift access.

Additional storage for police and fire department equipment and vehicles was also designed into the structure. A three-story, fire training tower, and fire truck pump training area further increases the multi-use capabilities of this sprawling complex. A massive outdoor canopy provides a cover area for materials storage.

Challenging Site Conditions Require Meticulous Preconstruction Planning Efforts

black and white rendering highlighting project area in color.

Detailed renderings provide insight into location flow and allow consumers to better follow the design process.

While the desired building site was centrally located and ideally suited for the public works departments, facility and site preparation efforts faced by the engineering team were impeded by a handful of challenges. Foremost was navigating poorly documented underground infrastructure in the area. The Snyder & Associates team used diligent research efforts to determine the size and locations of numerous existing onsite utilities.

By its nature, a public works facility must be designed to sustain heavy daily use in order to maintain the infrastructure of an active city. More importantly, the facility must continue full functionality even during catastrophic events, such as floods, inclement weather, or other natural disasters. Because this building site is located a short distance from the Iowa River and is in the floodplain, additional fill had to be trucked to the location to raise more than half of the site above the flood stage. This also ensured the facility was designed above and beyond a 500-year flood event, including the outdoor material storage area. The potential for flooding events also created a complex storm sewer design scenario the designers were required to accommodate.

This substantial facility will house millions of dollars worth of equipment and requires adequate protective measures to ensure no unauthorized entry while maintaining ease of access for employees. Our team aided in the design of security features for the facility including durable fencing and a modern gate access control system.

As mentioned, additional storage space and training areas for the police and fire departments were an integral part of the design. This included not only the fire training tower but also a fire pump test pit. This test pit consists of a baffled, underground storage tank that allows fire truck pumps to be tested using recirculated water, reducing waste. The unique design of the storage tank also eliminates the possibility of damaging the pumps.

Construction Coordination & Room for Expansion

The new Iowa City Public Works facility was meticulously planned to accommodate numerous city departments and create operational efficiencies citywide. Extensive site grading, paving, and thorough utility identification laid the groundwork for a successful project, including outdoor storage areas with drive aisles, and the capacity to accommodate future phases of construction around this large site. The engineers with Snyder & Associates used unique and creative solutions to meet the needs of this complex and multifaceted public works facility.

Client

Neumann Monson Architects

Client Type

Project Type

No team members assigned to this project.

Related Projects

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...
||||

Creating a Safer, Smarter Space for Animal Services in Des Moines

At the corner of SE 14th and Harriett streets in Des Moines, a forward-thinking facility now stands as a beacon of care for animals and the community. The new Des...
||

Madison’s First Permanent Men’s Shelter Prioritizes Sustainability & Dignity

For decades, men experiencing homelessness in Madison sought shelter in temporary spaces, often in church basements or emergency accommodations. That will soon change...
Aerial view of WLCSD new football field.||West Liberty Athletic Complex|Aerial image of the two new ballfields at the WLCSD athletic complex.|Close up aerial image of the backstop area at the new WLCSD athletic complex.|Aerial image of WLCSD new football field and track.|New synthetic turf being installed at the WLCSD athletic complex.

West Liberty Athletic Complex Consolidates Multiple Venues

The West Liberty Community School District (WLCSD) selected FEH Design and Snyder & Associates to prepare an athletic facility plan to consolidate their football,...
NE 51st Avenue intersection along US 69 reconstruction project.|intersection with traffic lights|Intersection at NE 70th Avenue intersection along the US 69 reconstruction project.|Intersection of NE 60th Avenue near the Polk County Sheriff's Office along US 69 reconstruction.|median under construction|LiDar image of US 69 reconstruction|Snyder & Associates Transportation experts

US 69 Reconstruction: Paving the Way for Future Growth in Ankeny

2024 Engineering Excellence Awards, Honor Award Winner in the Transportation Category awarded by the American Council of Engineering Companies (ACEC) of Iowa In the...
||Restoration from Marsh to Top Tier Course with featuring bright green golf course and Trees in background|

TPC Wisconsin Emerges as a Premier Golf Course

In the heart of Madison, Wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. Dennis Tiziani,...
newly constructed roadway intersection|Road traffic transitions into roundabout|Improved traffic flow due to new corridor|Snyder & Associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

Tower Terrace Road Upgrades Fill Gap in Northern Connector Initiative

Nearly two decades ago, planners for Linn County and several surrounding communities — including Cedar Rapids, Hiawatha, and Marion — began laying the groundwork for an...
Leachate Disposal Lift Station at Des Moines County Landfill|excavator digging trench for sewer force main|Leachate Disposal Submersible Wet Well Lift Station|Leachate Disposal Construction of Force Main|Leachate Disposal Wastewater force main Cleanout

Leachate Disposal Solution for Des Moines County Landfill & the City of West Burlington

For many years, the Des Moines County Landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
|||Aerial rendering of Hickman and Interstate 35/80 diverging diamond interchange.||Street level rendering of Hickman and Interstate 35/80 diverging diamond interchange.|||Rendering of pedestrian tunnel underneath Interstate 35/80 at Hickman Road diverging diamond interchange.|Bridge abutments design treatment underneath Interstate 35/80 diverging diamond interchange bridge.|||Median treatment rendering underneath Interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

Progress on the Interstate 35/80 & U.S. 6 Diverging Diamond Interchange Upgrade

The exponential growth of communities, particularly in the western suburbs of Des Moines, has been nothing short of remarkable. The population of Waukee, for example,...

more than 45 years

Serving Clients Around the Country

DB+