2727 SW Snyder Blvd, Ankeny, IA 50023

1 (888) 964-2020



Navigation

Back to Projects | Project Categories: Development | Stormwater

Modern Facility Consolidates Iowa City Public Works Municipal Operations

2021 Small Cities/Rural Communities, U.S. Project of the Year in the structures category from the American Public Works Association I 2022 Committee on the Environment (COTE) Top Ten Award winner from the American Institute of Architects (AIA) I 2022 Top Ten U.S. architecture projects presented by London-based online architecture and design magazine Dezeen

Several Public Works Facilities Brought Under One Roof

For years, Iowa City Public Works (ICPW) utilized several sites to house different departments and equipment. With the goal of consolidating multiple departments in one centralized location, the city enlisted Neumann Monson Architects to create a plan for developing a 14-acre, city-owned tract on the south side of town. The civil engineering team with Snyder & Associates was brought on board to provide their expertise for this multi-disciplinary design project. The resulting Public Works Master Plan called for the initial construction of a 100,000 square foot building to house the Streets and Water Departments, as well as their associated vehicles and equipment. This vast structure was constructed using highly durable, cost-effective materials that are easy to maintain. The building interior includes shop spaces, large-scale machinery storage, vehicle & equipment wash bays, and a mezzanine storage area with elevator and forklift access. Additional storage for police and fire department equipment and vehicles was also designed into the structure. A three-story, fire training tower, and fire truck pump training area further increases the multi-use capabilities of this sprawling complex. A massive outdoor canopy provides a cover area for materials storage.

Challenging Site Conditions Require Meticulous Preconstruction Planning Efforts

black and white rendering highlighting project area in color.

Detailed renderings provide insight into location flow and allow consumers to better follow the design process.

While the desired building site was centrally located and ideally suited for the public works departments, facility and site preparation efforts faced by the engineering team were impeded by a handful of challenges. Foremost was navigating poorly documented underground infrastructure in the area. The Snyder & Associates team used diligent research efforts to determine the size and locations of numerous existing onsite utilities. By its nature, a public works facility must be designed to sustain heavy daily use in order to maintain the infrastructure of an active city. More importantly, the facility must continue full functionality even during catastrophic events, such as floods, inclement weather, or other natural disasters. Because this building site is located a short distance from the Iowa River and is in the floodplain, additional fill had to be trucked to the location to raise more than half of the site above the flood stage. This also ensured the facility was designed above and beyond a 500-year flood event, including the outdoor material storage area. The potential for flooding events also created a complex storm sewer design scenario the designers were required to accommodate. This substantial facility will house millions of dollars worth of equipment and requires adequate protective measures to ensure no unauthorized entry while maintaining ease of access for employees. Our team aided in the design of security features for the facility including durable fencing and a modern gate access control system. As mentioned, additional storage space and training areas for the police and fire departments were an integral part of the design. This included not only the fire training tower but also a fire pump test pit. This test pit consists of a baffled, underground storage tank that allows fire truck pumps to be tested using recirculated water, reducing waste. The unique design of the storage tank also eliminates the possibility of damaging the pumps.

Construction Coordination & Room for Expansion

The new Iowa City Public Works facility was meticulously planned to accommodate numerous city departments and create operational efficiencies citywide. Extensive site grading, paving, and thorough utility identification laid the groundwork for a successful project, including outdoor storage areas with drive aisles, and the capacity to accommodate future phases of construction around this large site. The engineers with Snyder & Associates used unique and creative solutions to meet the needs of this complex and multifaceted public works facility.

Client

Neumann Monson Architects

Client Type

Project Type

No team members assigned to this project.

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country