2727 SW Snyder Blvd, Ankeny, IA 50023

1 (888) 964-2020



Navigation

Back to Projects | Project Categories: Wastewater

New Pump Station Expands St. Joseph’s Eastside Sewer System Reach

St. Joseph, Missouri, is a vibrant, industry-filled community located near the crossroads of Interstate 29 and MO Highway 36. With projected growth along the city’s Eastside, local leaders recognized that significant infrastructure adjustments were required and a sewer system and pump station to accommodate those changes was the first necessary step.

New Downstream Location Leads to Expanded Sanitary Sewer Services

The Easton Road pump station was constructed in 1979 and could no longer meet the demands being placed on it. The City of St. Joseph selected Snyder & Associates to replace this outdated and undersized structure with a newly designed wastewater facility in an enhanced location. Positioned 1.5 miles east of its predecessor, the new Candy Creek Pump Station opens up nearly 3,600 acres of an additional service area, which can be used for future community growth.

black and white map of sub basins

Map of sub-basins serviced by the new Candy Creek Pump Station

Our engineers and city staff strategically identified the new pump station’s site for its ability to serve the current drainage basin while expanding service to additional drainage basins in the region. To incorporate these areas, approximately 13,000 lineal feet of gravity sanitary interceptor sewer was designed and constructed, routing sewage from the added basins to the new pump station site.

Connecting this updated system to the city’s current sewer infrastructure required approximately 13,500 linear feet of force main to be placed. This pipeline, which conveys wastewater under pressure, was designed to cross an abandoned railroad route, County right-of-way, and an agri-business site before discharging into the community’s gravity collection system.

We understand the financial challenges that our clients face and work diligently to maximize the overall wastewater project value while minimizing design and construction costs. By determining the most direct path for the pipe and optimizing pump station design, Snyder & Associates was able to cut overall project costs.

Multi-Story Design Increases Pump Station Capacity and Efficiency

Snyder & Associates multidisciplinary engineering team applies objectivity and specialized knowledge to every project while also listening to our client’s preferences and making those a reality. This combination of skills led to the complete design for the Candy Creek Pump Station.

looking down on multi-level facility floors

View of effluent pumps located on the lowest level of the pump station

Built as three levels extending approximately 30-feet below ground, the layout features ample space for a separate pump, motor, electrical, and generator rooms. Constructing the facility at multiple levels allows for easy access to the new gravity sewer as it conveys incoming effluent to the system.

As preferred by the city, this station is a wet well facility with dry vertical eddy current drive centrifugal pumps. Incorporating a dry pump room into the system increases overall safety and eliminates classified or hazardous spaces per the National Fire Protection Association (NFPA) criteria. By creating the station in this manner, our designers allowed convenience for maintenance personnel and increased accessibility and safety for on-site operators.

Facility Design Easily Integrated Into Future Plans

Throughout planning stages, the city indicated that a wastewater treatment plant expansion to the Candy Creek structure was plausible at a future date. To accompany those plans, our team intentionally devised a pump station design that allows for the treatment facility to be seamlessly added to the current structure. Preliminarily plans were prepared for pipe re-routing and facility layout and even went as far as including the upstream headworks systems. Additional preparations were made accounting for future flow equalization pumps and a 1 million gallon equalization basin, which would serve as mitigation factors for wet weather flow peaks at the site.

At Snyder & Associates, we provide our clients with proactive, responsive, and cost-effective services. Throughout this process, we worked diligently to incorporate improvements that will enhance and accommodate the city’s growing population throughout the years to come.

Client

City of St. Joseph

Client Type

Project Type

No team members assigned to this project.

Related Projects

exposed siphon at omaha papio creek|drone map of the Papio Creek in Omaha NE|papio creek stream

Safeguarding Critical Infrastructure and Water Resources: Omaha’s “Papio” Creek

In March 2019, the City of Omaha faced a significant threat to its critical infrastructure under West Papillion Creek (known to locals as Papio Creek). A disastrous...
Leachate Disposal Lift Station at Des Moines County Landfill|excavator digging trench for sewer force main|Leachate Disposal Submersible Wet Well Lift Station|Leachate Disposal Construction of Force Main|Leachate Disposal Wastewater force main Cleanout

Leachate Disposal Solution for Des Moines County Landfill & the City of West Burlington

For many years, the Des Moines County Landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
Slater wastewater treatment greenhouse at sunset|Wastewater lagoon with aeration bubbles|Greenhouse and settling pond|Aerial view of large lagoon cell drained for construction|Slater's new greenhouse for wastewater treatment|Inside Slater greenhouse with empty cells|Inside of slater wastewater treatment plant with algae belts.|Slater wastewater treatment plant ribbon cutting|visitors walk inside the new Slater greenhouse and view RAB belts|aerated lagoon at the slater wastewater treatment plant|RAB belts at the Slater wastewater treatment plant

Slater Incorporates Algae to Treat Community Wastewater

For years, the City of Slater used an aerated lagoon system as its primary wastewater treatment method. However, increased awareness of pollutants and their impact on...
blue and red map of sewer system service area|corroded manhole|lime green map of pleasant hill sewer system and neighboring communities

Growth in Pleasant Hill Leads to Sanitary Sewer System Review

Snyder & Associates was tasked with conducting a Sanitary Sewer System Review, identifying long-term system and infrastructure upgrades.

square concrete new lift station|above ground section of vertical screen|large machine used to bore holes and make way for pipe|trenchless construction|lead tubing being placed before pipe|concrete tube that will eventually house pumps|square concrete new lift station

Lift Station Upgrades Eliminate Backups & Increase Efficiencies: Anamosa

Anamosa 2nd Street Wastewater Lift Station Improvements As community leaders in mature communities know, the need for new and more efficient wastewater systems is a...
large rectangle wastewater lagoon pond|snowy fields with school in distant background||large dirt hole during lagoon construction|concrete walls of the lagoons lift station placed in the ground

Starmont High School’s Wastewater Dilemma Requires Speedy Solution

Thanks to positive client relationships and word-of-mouth recommendations, Snyder & Associates was hired to find a viable wastewater solution for a high...
aerial view of two large blue lagoons and operation buildings||waterside view of lagoon and gravel shores|metal walkway between two lagoons. One is rough and one is smooth.||

West Burlington’s Wastewater Treatment Plant Upgraded to Meet Current NPDES Requirements

Snyder & Associates wastewater engineers were enlisted to develop a plan for remodeling and expanding West Burlington’s existing wastewater treatment...
car sprays water while driving through a large puddle||car sprays water while driving through a large puddle|view of downtown skyscrapers at then end of a main street|satellite map with project area outlined in red|construction work in a deep trench

Des Moines’ Sewer Separation Initiative Prevents Flooding, Backups & Overflows

Antiquated Stormwater & Wastewater System Fails to Meet New Standards When the City of Des Moines wastewater system was initially constructed, viable methods for...
Inside of the Disinfection-Flow Equalization Tank.|Inside of the SBR tank looking at the aeration piping system.|Inside of treatment tank looking at piping

Custom Wastewater Treatment Solutions for Growing Industrial Client

Working with this industrial client for over ten years, Snyder & Associates continues to provide the most cost-effective, environmentally-sound, and...
||||||new bluff creek lift station building

Wastewater System Analysis & Planning: Cedar Falls, Iowa

Community Growth Prompts New Wastewater System Needs Steady population growth and an expanding commercial base led to sewer system capacity issues in Cedar Falls, Iowa....

more than 45 years

Serving Clients Around the Country

DB+