2727 SW Snyder Blvd, Ankeny, IA 50023

1 (888) 964-2020



Navigation

Back to Projects | Project Categories: Development

Urban Site Development: Hilton Hotel

Residential/Hospitality Best Project, ENR Midwest, 2018

Overcoming Urban Site Development Constraints

This new, award-winning Hilton hotel located in downtown Des Moines stands eight stories high and features 330 rooms, 28 suites, and 14,000 square feet of meeting space. Other amenities include an indoor pool, fitness center, restaurant and bar, along with 135 underground parking spots. By combining these extensive amenities with a skywalk connection to the Iowa Events Center, the hotel is poised to strengthen downtown Des Moines' ability to accommodate regional and national conventions. This hotel is the result of over two years of planning and construction on behalf of a talented project team that included RDG Planning & Design, DLR Group, and The Weitz Company. Snyder & Associates provided stormwater management and utility routing and design services for the project.

Enhancing Water Quality Through Stormwater Management

The lobby of the new, award-winning Hilton Des Moines Downtown hotel. Snyder & Associates provided civil engineering services for this project.

The lobby of the Hilton Des Moines Downtown Hotel.

Due to site constraints that are typical with urban development in downtown areas, a StormTech underground detention system was utilized for stormwater management. Located below a new parking lot on the southeast corner of the site, the StormTech system consists of arched chambers within a rock envelope that collect and slowly release stormwater into the city’s sewer system. The system also enhances water quality by trapping dirt and debris from runoff. Manhole access on either end of the system allows for annual maintenance of the system. A roof drain connection for the new skywalk was incorporated and tied into the system along with trench drains for the parking garage. Our team also assisted with the new water and sanitary sewer service connections for the hotel along Park Avenue on the south side of the site. The location of the restaurant and banquet area required that the grease interceptors be located on the north side of the building. Due to site and right-of-way constraints, collaborative efforts were employed by the design team to route the sanitary sewer service along the foundation.

Innovative Construction Techniques Improve Safety

The project, which was built through a public-private partnership, received the 2018 Residential/Hospitality Best Project Award from ENR Midwest. Key award criteria included the ability to overcome challenges, use of innovative construction techniques, and the ability to complete the job safely. Aspects of the project that were emphasized to meet the award criteria included the use of:
  • Cloud-based, 3D modeling to streamline the construction process.
  • Prefabricated construction elements to reduce on-site labor needs, project cost, safety risks, and construction waste, while expediting the project schedule.
Specific services provided by the Snyder & Associates’ team included urban stormwater management planning, site design, hydrologic modeling, topographic survey, and traffic signal systems design.

Client

RDG Planning & Design

Client Type

Project Type

Eric Cannon, P.E.

Eric Cannon, P.E.

Development Business Unit Leader

Related Projects

Aerial view of a grid of streets in a small town, with fall foliage and a yellow water tower at center.

Iowa Highway 14 Four-to-Three Lane Conversion Improves Safety and Traffic Flow in Knoxville

When the Iowa Department of Transportation identified an opportunity to rehabilitate and resurface Iowa Highway 14 through Knoxville, the project became more than a...

HM Zander Nature Park Shelter Creates New Gathering Space Near Downtown Cross Plains

Situated near Downtown Cross Plains and the scenic Black Earth Creek corridor, the open-air shelter and spectator space at HM Zander Nature Park create a welcoming...

Jasper County Highway F-48 Improvements Strengthen Safety and Connectivity

Jasper County has undertaken a multi-phase improvement program along County Highway F-48, extending from the City of Newton/Lambs Grove area west to the Polk...

Prairie Ridge Sports Complex – Ankeny, IA

Supporting Premier Community Athletics Destination Snyder & Associates has partnered with the City of Ankeny over the years to help shape, improve, and expand...

Memorial Tower Replacement Expands Water Storage Capacity in Council Bluffs

Expanding Capacity for the Future: Council Bluffs Water Works Memorial Tower Replacement Council Bluffs Water Works (CBWW) is replacing its long-serving Memorial Tower...

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

Grand Place Award in the Transportation Category for the 2026 Engineering Excellence Awards Competition for ACEC Iowa The 8th Avenue Reconstruction & Mount Vernon...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Enhancing Access at Atwater Park, Village of Shorewood, Wisconsin

Perched atop a bluff 100 feet above the shores of Lake Michigan, Atwater Park is one of Shorewood’s most iconic civic spaces. Serving as a passive park, community...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

more than 45 years

Serving Clients Around the Country