Cedar Heights Drive Reconstruction Continues Cedar Falls Corridor Upgrades

For several years, the Cedar Falls community has been expanding its transportation network along the southern edge of town, including the Greenhill Road corridor. This work was completed to accommodate new commercial and residential development in the area and to provide commuters with another route through town. Piggybacking on the success of the traffic study that resulted in the Greenhill Road improvements, our team was again tasked with improving the Cedar Heights Drive corridor, extending south from Greenhill Road to the Viking Road intersection.

Before reconstruction, the existing Cedar Heights Drive corridor consisted of a two-lane rural section that was a main thoroughfare for commuters and a primary access route to the John Deere facility on the south side of town. This comprehensive project included reconstructing the entire roadway to a three-lane urban section (with a two-way, left-turn lane), adding an extensive storm sewer system, building a trail, and extending the sanitary sewer and water main.

Roundabouts Smooth Out Traffic Flow, Increase Safety

Beginning at the Greenhill Road intersection, this project converted the existing signalized intersection to a multi-lane roundabout configuration. The existing T-intersection was converted to a single-lane roundabout at the Huntington Road intersection. Additionally, a truck apron and landscape features were added to the Viking Road roundabout at the south end of the project zone. The use of roundabouts will drastically improve the traffic flow along the corridor and increase safety.

These improvements significantly impacted the Cedar Heights Drive and Greenhill Road areas. The Cedar Heights Drive reconstruction south from the intersection with Viking Road and north past the intersection with Greenhill Road, along with the construction of the roundabouts, was divided into two segments, beginning with the Greenhill Road roundabout. This staging effort allowed traffic access at the Huntington Road intersection while work was performed to the north.

In addition to the roadway reconstruction and widening, this project also saw the construction of a recreational trail running adjacent to the roadway, a new water main, sanitary sewer main, and storm sewer main were included from the East Viking Road roundabout north and east through the intersection of East Greenhill Road.

Stormwater Analysis Drives New Sewer System

Traffic was temporarily rerouted to accommodate the reconstruction efforts.

An extensive stormwater analysis revealed the need for a new storm sewer system to meet SUDAS standards. One portion of the new roadway included a boulevard section, which limited the pavement area available for stormwater conveyance while maintaining an open lane for travel during runoff events. This area required additional intakes to meet the design requirements. Various intake types and pipe materials were reviewed to optimize capture rates and reduce project costs. This required appropriate storm sewer intakes and pipe sizes to minimize the runoff spread on the arterial roadway. The stormwater improvements included dozens of new intakes and thousands of feet of storm sewer.

Our team was also instrumental in this project, receiving numerous funding sources, including Iowa Department of Transportation (DOT) Federal-Aid swap funds, Traffic Safety Improvement Program (TSIP) funds, and multiple local funding sources to implement these improvements.

The Cedar Heights Drive reconstruction project has significantly improved the transportation network in Cedar Falls. With the expansion of the roadway to a three-lane urban section, the addition of storm sewers, recreational trails, and extensions of water and sewer mains, this project has enhanced the area’s infrastructure for both commuters and residents. Roundabouts have greatly improved traffic flow and increased safety along the corridor. This project was successful due to the collaborative efforts of the Cedar Falls community, our team, and the multiple funding sources that supported the initiative.

Client

City of Cedar Falls

Client Type

Project Type

Patrick Schwickerath, P.E.

Patrick Schwickerath, P.E.

Civil / Transportation Engineer

Related Projects

8th Avenue Reconstruction & Mount Vernon Road Rehabilitation – Cedar Rapids, Iowa

The 8th Avenue Reconstruction & Mount Vernon Road Rehabilitation project, designed by Snyder & Associates, represents one of Cedar Rapids’ most significant...

3rd Street Northeast Reconstruction – Belmond, Iowa

Modernizing Infrastructure and Enhancing Connectivity in Belmond To address aging infrastructure and improve overall street conditions, the City of Belmond partnered...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...

From Des Moines to Carlisle on the Karras-Kaul Connector Trail

Central Iowa’s trail network is expanding with the Carlisle Multi-Use Trail Connection, now known as the Karras-Kaul Connector Trail. Spearheaded by Des Moines city...
||

Madison’s First Permanent Men’s Shelter Prioritizes Sustainability & Dignity

For decades, men experiencing homelessness in Madison sought shelter in temporary spaces, often in church basements or emergency accommodations. That will soon change...
Aerial view of WLCSD new football field.||West Liberty Athletic Complex|Aerial image of the two new ballfields at the WLCSD athletic complex.|Close up aerial image of the backstop area at the new WLCSD athletic complex.|Aerial image of WLCSD new football field and track.|New synthetic turf being installed at the WLCSD athletic complex.

West Liberty Athletic Complex Consolidates Multiple Venues

The West Liberty Community School District (WLCSD) selected FEH Design and Snyder & Associates to prepare an athletic facility plan to consolidate their football,...
Overlaid pavement on 1st Ave with railroad crossing in the background|Aerial view of Ellis Boulevard and 6th street NW Connector & 1st ave rehabilitation in Cedar Rapids Iowa|Aerial view of Ellis Boulevard and 6th street NW Connector & 1st ave rehabilitation in Cedar Rapids Iowa|Aerial view of Ellis Boulevard and 6th street NW Connector & 1st ave rehabilitation in Cedar Rapids Iowa|Railroad crossing|Roundabouts Streamline Traffic Flow|Cars driving around the roundabout creating efficient traffic flow|1st Ave & 6th Street Intersection facing North Before & After Construction

Ellis Boulevard & 6th Street NW Connector & 1st Avenue Rehabilitation: Cedar Rapids

A planning initiative performed in the community of Cedar Rapids identified a critical need for better connections and smoother traffic flow between the Kingston...
Aerial rendering of the Grand Avenue roadway extension in West Des Moines|Map of National Flood Hazard Layer of the project area|Image of construction taking place for Grand Avenue extension in West Des Moines Iowa with construction workers and cement trucks in the background|Newly poured roadway with road crew working in the background.|Image of construction taking place for grand avenue extension in West Des Moines Iowa|New bridge over Johnson Creek with earthwork still to complete underneath.|View of the Johnson Creek Bridge along Grand Avenue with the new monuments installed on either side.|Custom-designed monuments for the City of West Des Moines

Grand Avenue Extension in West Des Moines Opens Additional Area for Development

To provide access to Microsoft's new data center and open additional area for development in southwest West Des Moines, city leaders contracted with Snyder and...
A man running on trail underneath bridge|Creek bank underneath bridge|Map of the new Clear Creek Trail alignment around the Interstate 80/380 interchange|Workers install one of the bridges over Clear Creek|Decorative Concrete castings for Clear Creek Trail Connection|Clear Creek Trail connection bridge|Trail underneath bridge in Coralville Iowa

Clear Creek Trail Connection Fills Critical Multi-Modal Gap: Coralville, Iowa

The Clear Creek Trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in Johnson County....
Roundabout in Anamosa Iowa|Roundabout in Anamosa Iowa|Overview of US 151 Grade Separation and Roundabout in Anamosa Iowa|Roundabout design showcasing lighting and signage in Anamosa Iowa|Man cutting the ribbon for US 151 Grade Separation and Roundabout in Anamosa Iowa||US 151 Grade Separation and Roundabout: Anamosa

US 151 Grade Separation and Roundabout: Anamosa, Iowa

In a strategic move to address safety concerns and bolster regional connectivity, the City of Anamosa required a unique transportation solution to address a regional...

more than 45 years