Glass-Walled Student Innovation Center Impresses & Inspires: Iowa State University Campus

When the idea was first proposed for a student experimentation center on the Iowa State University Campus, leaders envisioned a flexible, open space that would elevate the school’s hands-on learning approach. Fast forward several years, and the newly completed five-story Student Innovation Center (SIC) delivers on that dream with over 140,000 square feet of laboratories, shops, and classrooms. This spectacular, glass-walled structure allows students to experiment with robotics, design software, work with 3D printing, and even learn how to blow glass.

The building has an evolving set of “maker” spaces ranging from metal, wood, and composite fabrication shops to a test kitchen, café, retail outlet, and a rooftop garden. As the lead civil engineering firm for this expansive project, the Snyder & Associates team was tasked with developing a site plan that would blend with the existing campus surroundings while at the same time creating a safe and welcoming environment for students.

Demolition, Historic Preservation, & Utility Coordination Highlight Development Plan

To accommodate the modern facility in the middle of the Iowa State campus, our team was faced with planning the demolition of a portion of Sweeney Hall and the underutilized nuclear engineering building. These plans had to account for an active campus environment and the constrained site location. Additionally, the design team needed to take extra precautions so as not to disturb the foundation of the Marston Water Tower located adjacent to the site. This 168-foot-tall, iconic tower is listed on the National Register of Historic Places.

Water tower on Iowa State's Campus

The proximity of the Marston Water Tower to the site required meticulous planning by the design team.

As a further challenge to the team, the building site contained a congested area of underground utilities, including storm sewer, sanitary sewer, steam tunnel, electrical primary feeders, natural gas lines, and telecommunication. Daily communication with the onsite mechanical, electrical, and plumbing contractors was necessary for seamless coordination. Shuck-Britson, a subsidiary of Snyder & Associates, was enlisted to create the new electrical vaults and steam tunnel designs in the tight quarters.

The design team also utilized phased construction by creating bid packages for the building and site demolition, site utility installation, building construction, and site restoration. This method further streamlined the entire site development and building construction process.

Underground Stormwater Detention & Multimodal Accommodations

Running along the west side of the building location, Bissell Road is the main thoroughfare through campus. However, the storm sewer system along this route was nearing capacity even before this project was envisioned. Our team devised a plan to install an underground stormwater detention system to provide adequate drainage for the new building site. With the already congested utility issue in the area, adding this system took meticulous planning. Our team determined that two strategically placed StormTech stormwater chamber systems could adequately handle the site’s stormwater needs.

Parking area cement work

The stormwater detention basins were hidden under parking and driveway areas.

These chambers, or vaults, consist of large sections of corrugated plastic placed on a compacted gravel bed. Once covered, stormwater is diverted to the basin through normal channels where it’s temporarily stored. It’s then released through a series of outlet pipes specifically designed to let water out in a controlled manner to mitigate flooding.

Like several other projects our team has designed for Iowa State University and other college campuses, the need for multimodal accommodations was a chief concern. To meet this need, safe and expansive pedestrian walkways, and convenient bicycle parking were included in the external design, along with separate building access for vendor and maintenance traffic.

Iowa State’s new Student Innovation Center was designed with future changes and reconfigurations in mind. The interior building systems were left exposed for just this reason. The all-glass exterior was designed to reduce the building’s solar heat gain and simultaneously capture daylight to reduce energy consumption. These forward-looking ideas promote the sustainability of modern innovation and position this world-class structure for LEED Gold Certification soon. Undoubtedly, this award-winning facility will inspire many more generations of Iowa State students.

Client

Iowa State University

Client Type

Project Type

Jerod Gross, P.E., LEED®AP

Jerod Gross, P.E., LEED®AP

Civil / Transportation Engineer

Related Projects

Site Design & Sustainability Drive Sun Prairie Library Expansion

Snyder & Associates played a central role in the planning and site design for the Sun Prairie Public Library Expansion and Renovation Project. This $26 million...

Hickman Road & SE Legacy Pointe / NW 161st Street Intersection Improvements

To support long-term traffic efficiency and corridor consistency along Hickman Road, the cities of Clive and Waukee partnered on a joint project to reconstruct and...
||||

Creating a Safer, Smarter Space for Animal Services in Des Moines

At the corner of SE 14th and Harriett streets in Des Moines, a forward-thinking facility now stands as a beacon of care for animals and the community. The new Des...
||

Madison’s First Permanent Men’s Shelter Prioritizes Sustainability & Dignity

For decades, men experiencing homelessness in Madison sought shelter in temporary spaces, often in church basements or emergency accommodations. That will soon change...
Aerial view of WLCSD new football field.||West Liberty Athletic Complex|Aerial image of the two new ballfields at the WLCSD athletic complex.|Close up aerial image of the backstop area at the new WLCSD athletic complex.|Aerial image of WLCSD new football field and track.|New synthetic turf being installed at the WLCSD athletic complex.

West Liberty Athletic Complex Consolidates Multiple Venues

The West Liberty Community School District (WLCSD) selected FEH Design and Snyder & Associates to prepare an athletic facility plan to consolidate their football,...
NE 51st Avenue intersection along US 69 reconstruction project.|intersection with traffic lights|Intersection at NE 70th Avenue intersection along the US 69 reconstruction project.|Intersection of NE 60th Avenue near the Polk County Sheriff's Office along US 69 reconstruction.|median under construction|LiDar image of US 69 reconstruction|Snyder & Associates Transportation experts

US 69 Reconstruction: Paving the Way for Future Growth in Ankeny

In the heart of unincorporated Polk County, a bustling two-lane corridor known as US Highway 69 (NE 14th Street) has long been a critical lifeline connecting Des Moines...
||Restoration from Marsh to Top Tier Course with featuring bright green golf course and Trees in background|

TPC Wisconsin Emerges as a Premier Golf Course

In the heart of Madison, Wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. Dennis Tiziani,...
newly constructed roadway intersection|Road traffic transitions into roundabout|Improved traffic flow due to new corridor|Snyder & Associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

Tower Terrace Road Upgrades Fill Gap in Northern Connector Initiative

Nearly two decades ago, planners for Linn County and several surrounding communities — including Cedar Rapids, Hiawatha, and Marion — began laying the groundwork for an...
Leachate Disposal Lift Station at Des Moines County Landfill|excavator digging trench for sewer force main|Leachate Disposal Submersible Wet Well Lift Station|Leachate Disposal Construction of Force Main|Leachate Disposal Wastewater force main Cleanout

Leachate Disposal Solution for Des Moines County Landfill & the City of West Burlington

For many years, the Des Moines County Landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
|||Aerial rendering of Hickman and Interstate 35/80 diverging diamond interchange.||Street level rendering of Hickman and Interstate 35/80 diverging diamond interchange.|||Rendering of pedestrian tunnel underneath Interstate 35/80 at Hickman Road diverging diamond interchange.|Bridge abutments design treatment underneath Interstate 35/80 diverging diamond interchange bridge.|||Median treatment rendering underneath Interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

Progress on the Interstate 35/80 & U.S. 6 Diverging Diamond Interchange Upgrade

The exponential growth of communities, particularly in the western suburbs of Des Moines, has been nothing short of remarkable. The population of Waukee, for example,...